Installation of new electric heat pump/split system air conditioner at unit 2D/3DNYC - Manhattan · 2025$33,566
INTERIOR RENOVATION AND OF A THREE BEDROOM APARTMENT 9A; WORK INCLUDES 3 BEDROOMS, 3 BATHROOMS, LIVING ROOM, DINING ROOM, STUDY AND A KITCHEN; NO CHANGE INUSE OR EGRESS.NYC - Brooklyn · 2025$195,000
Conjoining Apartments 2D(01) and 3D(02).NYC - Manhattan · 2025$64,000
Conjoining Apartments 2D(01) and 3D(02).NYC - Manhattan · 2025$64,000
Renovation of an existing apartment #23AB on the twenty third floor. Work to include non-structural demolition and general construction.NYC - Brooklyn · 2025$243,400
Renovation of an existing apartment #23AB on the twenty third floor. Work to include non-structural demolition and general construction.NYC - Brooklyn · 2025$243,400
Renovation of an existing apartment #23AB on the twenty third floor. Work to include non-structural demolition and general construction.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
NYC - Brooklyn · 2025
$243,400
Renovation of an existing apartment #23AB on the twenty third floor. Work to include non-structural demolition and general construction.NYC - Brooklyn · 2025$243,400
INTERIOR RENOVATION AND OF A THREE BEDROOM APARTMENT 9A; WORK INCLUDES 3 BEDROOMS, 3 BATHROOMS, LIVING ROOM, DINING ROOM, STUDY AND A KITCHEN; NO CHANGE INUSE OR EGRESS.NYC - Brooklyn · 2025$195,000
Conjoining Apartments 2D(01) and 3D(02).NYC - Manhattan · 2025$64,000
Conjoining Apartments 2D(01) and 3D(02).NYC - Manhattan · 2025$64,000
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION. NO CHANGE TO USE EGRESS OR OCCUPANCYNYC - Brooklyn · 2024$80,000
Permitted projects on public record. Addresses are omitted for privacy.