Exterior storefront repairs completed under another permit filed by Abraxis, included new storefront windows, doors, exterior siding. Interior repairs to include the following: repairs to existing framing and subfloor (replace in kind as needed), minor carpentry to accomodate new drywall, replacement of ceiling grid system, insulation in exterior walls, new drywall, prime and paint, new floor finishes. All electrical work to be permitted and completed by licensed electriciansAll plumbing work to be permitted and completed by licensed plumbersAll HVAC work to be permitted and completed by licensed HVAC contractors.All removals completed in previous work by owner. Our removals will be limited to demolition of existing electrical and some removals of the ceiling grid, subfloor and deteriorated floor joists.City of Buffalo · 2025$150,000
No plans, interior tear out in preparation for rehabilitation and plans to be submitted by eco logic. Plaster and lathe.City of Buffalo · 2025$20,000
Make repairs to exterior siding and trim work. Scrape, prime and paint.
Interior plaster repairs, reskimming walls for improved finishes.
New cabinetry.
New finished flooring.City of Buffalo · 2025$20,000
This permit is strictly for removal of a 2 story rear deck. No soft materials. Only lumber. Rebuild plans have been submitted by Jim Reddin Construction. Work to commence immediately. All exterior to main building envelope.City of Buffalo · 2024$5,000
This is exclusively for interior tear out of plaster walls, drywall, old cabinets, etc. at the front upper apartment at 117 Massachusetts. No other work will be completed by our crew. No structural elements to be removed. All disposal and hauling to Ogden Street Transfer Facility via our own dump trailers. No kitchen/bathroom "remodeling"..."tear out" only.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Buffalo · 2024
$6,000
We were asked to continue the tear out of interior demolition that was already begun by the owners. This is strictly a tear out permit for 1.5 rooms. There isn't an option on the next page for this category, so i will choose kitchen/bathroom, though no kitchen or bathroom is being renovated for this project. It consists of approximately 300 square feet of walls and ceilings in a lower apartment. An asbestos survey was obtained and attached.
No flooring to be removed.City of Buffalo · 2024$3,000
Interior tearout, plaster and lathe, non structural elements. Asbestos survey attached.City of Buffalo · 2024$5,000
Remove a steel fire escape from the East Wall of the building, exterior.City of Buffalo · 2024$2,000
***DEMOLITION*** TO AN EXTISTING 2 STORY REAR STRUCTURE DEMOLISH TO GRADE FUTURE LAND USE VACANT.<div><br></div><div>***ICR-56***<br><div><br></div><div><br></div></div>City of Buffalo · 2023$14,500
Work in this permit is specific to the interior tear out and removal of interior finishes plaster and lathe in advance of rehabilitation and construction. A small rear addition (single story, shed roof, not original) will also be removed (approximately 6' x 15')City of Buffalo · 2023$18,000
The property was partially damaged by fire. This permit is for the tear out only, plans to be filed under a separate permit. . The owner has performed all interior demolition and removal of drywall/insulation in all affected areas. ***inspector justin higgins has the negative asbestos report in his file***City of Buffalo · 2023$16,000
This permit is intended for the beginning of work to be completed at 809 Amherst. Plans to be submitted by Kathy Kinan. Asbestos abatement by SEG Construction. Electrical service upgrade recently completed by Brady Construction, new wiring by Brady Construction upcoming. BFlo Plumbing to perform plumbing and HVAC upgrades.
This permit is for the stabilization and repair of the garage, repair/replace in kind studs and sill plates. Shore walls and plumb walls. Install new garage door. Stabilize from the exterior small rear addition that has settled in the rear of the house. repair and replace studs and joists in kind as necessary.
Repair/replace cedar shakes damaged by a previous fires, exterior.City of Buffalo · 2023$19,500
Permitted projects on public record. Addresses are omitted for privacy.