Increase size and relocate the Electrical Service. Relocate meter to exterior of bldg. per National Grid. Install smoke detectors if not in place now.
ESO #31053868City of Buffalo · 2024$2,000
Lower unit-Removal of knob and tube wiring. Remodel of bedrooms, bathroom and kitchen lower unit only.City of Buffalo · 2021$1,000
New Hot tub with CB and GFCI Protection with Emergency Disconnect and grounding as required.City of Buffalo · 2020$600
Work Request 29121228 (ESR). A new 200 amp single phase 120/240 volt electrical drop to the building. 2-100 amp Nema 3R enclosures for 2 residential units on the 2nd floor of the building. (eliminates shared utilities and gives access rights to tenants.) One new 150 amp subfeed commercial bypass meter for the bar and grill occupying the 1st floor. Update grounding and smoke detection systems as required.City of Buffalo · 2020$6,500
Increase and relocate the service from 120 v 30 amp (each unit) to a 150 amp Drop at 240 volts split to 2-100 amp 240 volt MCB load centers (Nema 3R) with a subfeed to new basement subpanels. ALL grounding and bonding to be upgraded, per NEC. Massive bonding on water piping do to substandard plumbing work with pex. Smoke detection/ CO2 system as required.City of Buffalo · 2020$3,500
Update 2 unit service 150amp riser with 2 100amp MCB loadcenters. Grounding, bonding, smoke system as required. Wire the kitchen and bath in upper unit only!
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Buffalo · 2019
$3,000
Partial remodel of a multiunit structure on waterfront. Unit was flooded from the second floor.. Remodel of the kitchen/bathroom and closet. Add 5 new circuits (15 amp and 20 amp) total wired to NEC code. New high hat recessed fixtures, 7 new counter recepticles. Building is unoccupied access to inspector via a key hidden to the right (facing front door) of the door. Key hidden UNDER a brick on the right side of the A/C unit.City of Buffalo · 2019$1,000
Increase and Relocate a 2 family res. service to exterior of bldg.. ESR #28118090. 2nd floor service to change from 120 v to 240volt. 150 amp drop to new exterior meter channel. 2 100 amp 240 volt services from the meter drop. Replace one (upper) load center. Install at service GFCI outlets for each unit. Install CO2 and smoke detectors with a 10 year battery and120volt for each unit in basement near furnaces and load centers. Install 4 new 10 year smokes in each 3 bedroom unit. Update all grounding and bonding to code.City of Buffalo · 2019$650
ESR: 27764505 On site work consisted of removal of a meter JAW in a channel (possible theft of services). Replacement was an identical jaw from another channel. Work was performed with NG onsite. CUSTOMER now claims he is seeking to set a meter via the utility. They claim otherwise. PLEASE release the meter for the second floor meter to be set. If access to building is necessary contact OWNERS Lance or Terri at 472-8883 or 440-3565 respectively. Meter channel NOW contains both plastic seals and Anti-theft barrel Locks.City of Buffalo · 2019$300
New 200 amp exterior electrical service with new interior wiring. Customer Installed additional 100 amp subpanel where original service panel was and same for garage. Upgrade grounding and bonding. Install fully functional network smoke detector system to include 10 new battery CO2 smoke detectors and a new hardwired master in the basement to the same network. National Grid ESR# 26481072. Customer installed by himself 70 receptacles 24 lights and 38 new circuits WITHOUT wall removal, over the last 3 to 4 years. Customer is an electrical engineer. Inspection by myself for compliance on same wiring. I advised customer on his errors with doing his own wiring. Told him inspections on all that work is REQUIRED.City of Buffalo · 2018$2,000
New 150 amp electrical service for a two family residential building. Includes two 100 amp service entrance feeders to two existing MCB panels. Update grounding, bonding and smoke detection system. Additional wiring to be added to site of recent fire damage (November 2017). Additional fees to be included, if needed, for inspection. Scope oft work for fire damage not determined at this time. National Grid ESR#25649444City of Buffalo · 2018$1,200
New Kitchen wiring 5 new counter top circuits refrigerator, microwave and dishwasher wiring. Extension and replacement of 5 recessed soffit cans in soffitCity of Buffalo · 2017$1,200