Labor and materials to install HVAC as follows:
2- Unico High velocity Air handlers.
-One placed in the attic to cover second story of the home.
-One placed in basement to cover first floor.
-Basement system will provide limited basement ventilation for finished areas.
2- Trane Condensers
-Model 4TTR6036
-16 SEER
2-High Static Duct systems installed.
-24 circular White Oak floor vents
-24 Circular white plastic ceiling vents
2-Renew Aire ERV units with ducting
-1 Attic mount, 1 Basement Mount.
2-Hot water coils installed in Ductwork
2-Media Filters
-16x25x4
2- Supply and Return duct plenums
2-Condensate Pumps/Piping systems
1-Condensate Drain pan with wet switch protection.
2- Honeywell Vision Pro 8000 thermostats
-wireless with interface module.
-Indoor air quality monitoring to control ERV.
Labor and materials to install HVAC as follows:
2- Unico High velocity Air handlers.
-One placed in the attic to cover second story of the home.
-One placed in basement to cover first floor.
-Basement system will provide limited basement ventilation for finished areas.
2- Trane Condensers
-Model 4TTR6036
-16 SEER
2-High Static Duct systems installed.
-24 circular White Oak floor vents
-24 Circular white plastic ceiling vents
2-Renew Aire ERV units with ducting
-1 Attic mount, 1 Basement Mount.
2-Hot water coils installed in Ductwork
2-Media Filters
-16x25x4
2- Supply and Return duct plenums
2-Condensate Pumps/Piping systems
1-Condensate Drain pan with wet switch protection.
2- Honeywell Vision Pro 8000 thermostats
-wireless with interface module.
-Indoor air quality monitoring to control ERV.City of Buffalo · 2026$107,000
Permitted projects on public record. Addresses are omitted for privacy.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.