Install PEX-a water lines and PVC drains and venting to serve all fixtures. Laundry and bathroom group on second floor, half-bath and kitchen on first floor. Connect to existing sewer in basement and all drains replaced throughout. Connect to existing copper service in basement and all water lines replaced throughout. New tankless water heater installed. Gas lines for heating equipment, water heater, and dryer installed.City of Buffalo · 2026$8,000
Vented drain lines and water lines roughed in to serve two lavatory basins, toilet, and shower. New piping for all connected to existing stack and risers. Fixtures set in finish stage.City of Buffalo · 2026$6,000
Replaced drains throughout home serving existing kitchen and bathroom, connecting to existing drain stack in basement and vent stack in attic. Installed new drains to serve new bathroom. New water lines xistinfrom eg service to all fixtures; all galvanized replaced with PEX-a. Three new bathing units installed.City of Buffalo · 2025$11,000
Permitted projects on public record. Addresses are omitted for privacy.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.