What the public permit record shows, not self-reported reviews.
Is KRAUS-ANDERSON CONSTRUCTION COMPANY a real contractor?
KRAUS-ANDERSON CONSTRUCTION COMPANY appears in public building-permit records with 24 permits filed in and around City of Saint Paul, MN. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is KRAUS-ANDERSON CONSTRUCTION COMPANY's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to KRAUS-ANDERSON CONSTRUCTION COMPANY by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is KRAUS-ANDERSON CONSTRUCTION COMPANY licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. KRAUS-ANDERSON CONSTRUCTION COMPANY has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
REPLACEMENT OF EXISTING CHILLER #3 INCLUDING NEW ROOFTOP COOLING TOWER, WINDOWS/OVERHEAD DOOR AT NORTH ELEVATION, STRUCTURAL STEEL FOR TOWERS AND FLOOR OPENINGS. — Remodel — InstitutionalCity of Saint Paul$5,793,926
REMODEL OF IR4 ROOM, CONTROL ROOM, EQUIPMENT ROOM AND READING ROOM FOR NEW EQUIPMENT. — Remodel — InstitutionalCity of Saint Paul$700,631
435 HUMIDIFIER
CREATE A HUMIDIFIER ROOM. MECHANICAL AND ELECTRICAL NOT INCLUDED APART OF THIS PERMIT — Remodel — CommercialCity of Saint Paul$31,993
401 CT1 REMODEL
REMODEL OF CT1 ROOM — Remodel — CommercialCity of Saint Paul$238,428
ST. ANTHONY PARK ELEMENTARY SCHOOL --INTERIOR DEMOLITION AND ROOF REPAIR
**** NOTE: RESTROOM DESIGN HAS BEEN APPROVED BY BUILDING OFFICIAL STEVE UBL *** — Addition — InstitutionalCity of Saint Paul$110,000
401 CT2 REMODEL
REMODEL OF EXISING CT2 ROOM FOR NEW EQUIPMENT — Remodel — CommercialCity of Saint Paul$265,188
REMODEL OLD EQUIPMENT ROOM AND STORAGE INTO MAILROOM. — Remodel — Institutional
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you KRAUS-ANDERSON CONSTRUCTION COMPANY?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to KRAUS-ANDERSON CONSTRUCTION COMPANY's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Saint Paul
$190,274
REMODEL OLD CASTING BAYS ROOM INTO 3 EXAM ROOMS IN CANCER CARE — Remodel — InstitutionalCity of Saint Paul$190,263
ST. ANTHONY PARK ELEMENTARY SCHOOL
INCLUDES THE DEMOLITION OF 10,000 SF OF EXISTING BUILDING AND BUILDING TWO NEW ADDITIONS TOTALING 27,800 SF AND REMODELING OF THE REMAINING 57,200 SF OF EXISTING BUILDING.
**** NOTE: RESTROOM DESIGN HAS BEEN APPROVED BY BUILDING OFFICIAL STEVE UBL *** — Addition — InstitutionalCity of Saint Paul$15,600,000
RADIOLOGY EQUIPMENT REPLACEMENT PHASE 2. REMODEL RADIOLOGY ROOM #7. — Remodel — InstitutionalCity of Saint Paul$590,000
N/A. REMOVE EXISTING ROOF STRUCTURE (ON GRADE LEVEL) AND REPLACE WITH NEW CONCRETE ROOF. REINFORCE EXISTING CONCRETE WALLS ON INTERIOR OF BASEMENT. INSTALL NEW WATERPROOFING AND REPOUR SIDEWALK/DRIVE AREA. — Repair — InstitutionalCity of Saint Paul$1,924,136
SITE WORK AND INTERIOR DEMOLITION BP#1 PACKAGE
— New — InstitutionalCity of Saint Paul$283,964
Permitted projects on public record. Addresses are omitted for privacy.