Is COLLIERS ENGINEERING AND PROPERTY SERVICES LLC legit?
What the public permit record shows, not self-reported reviews.
Is COLLIERS ENGINEERING AND PROPERTY SERVICES LLC a real contractor?
COLLIERS ENGINEERING AND PROPERTY SERVICES LLC appears in public building-permit records with 11 permits filed in and around City of Saint Paul, MN. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is COLLIERS ENGINEERING AND PROPERTY SERVICES LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to COLLIERS ENGINEERING AND PROPERTY SERVICES LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is COLLIERS ENGINEERING AND PROPERTY SERVICES LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. COLLIERS ENGINEERING AND PROPERTY SERVICES LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
HARD WIRED SMOKE DETECTOR (1)
**You may also schedule an inspection for this type of work during the hours of 7:30AM - 4:30 PM by contacting our Call Center at 651-266-8989.** — Residential Repair/Alter — Service & CircuitsCity of Saint Paul$100
INSTALL NEW LED STRIP LIGHT FIXTURES DOWN THE AISLES OF STORAGE UNITS. INSTALL LED EXIT AN EMERGENCY AS REQUIRED. WIRE (3) 3 TON ROOFTOPS — Commercial Repair/Alter — Service & CircuitsCity of Saint Paul$20,000
REPLACE 100 WATT INCONDESCENT LAMPS W/208 4 IN LED FIXTURE. REPLACE 26 FLUORESCENT BULBS W/26 8 IN LED LIGHT FIXTURES — Commercial Repair/Alter — ElectricalCity of Saint Paul$40,000
Install 3 new 24 ft light poles — Commercial New — ElectricalCity of Saint Paul$15,000
SMOKE DETECTOR ONLY — Residential Repair/Alter — Smoke Alarm OnlyCity of Saint Paul$300
INSTALL NEW LED STRIP LIGHT FIXTURES DOWN THE AISLES OF STORAGE UNITS. INSTALL LED EXIT AN EMERGENCY AS REQUIRED. WIRE (3) 3 TON ROOFTOPS — Commercial Repair/Alter — Service & CircuitsCity of Saint Paul$20,000
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you COLLIERS ENGINEERING AND PROPERTY SERVICES LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to COLLIERS ENGINEERING AND PROPERTY SERVICES LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
REPLACE 100 WATT INCONDESCENT LAMPS W/208 4 IN LED FIXTURE. REPLACE 26 FLUORESCENT BULBS W/26 8 IN LED LIGHT FIXTURES — Commercial Repair/Alter — ElectricalCity of Saint Paul
$40,000
PER FIRE'S ORDERS, REF#16194 -CREATE OPENING IN THE CORRIDOR WALL FOR ANOTHER MEANS OF EGRESS THROUGH THE WAREHOUSE. — Remodel — CommercialCity of Saint Paul$5,000
SMOKE DETECTOR ONLY — Residential Repair/Alter — Smoke Alarm OnlyCity of Saint Paul$300
Furnish install and wire 31) Fixture A. Texas Fluorescents. 8-foot linear strip with 4) 18.5 w 40K LED tubes with Passive Infrared (PIR) Motion detector sensor mounted to the middle of the fixture at the Factory. Furnish install and wire 21) Fixture EM. Best Lighting. High output LED emergency light fixture RMR-16 Furnish install and wire 14) Fixture F1. ISOL E-3 Lighting. Pendant mounted Exit light. Wire 4) gas fired unit heaters. Wire 4) thermostats. Furnish install and wire 8) double duplex convenience receptacles throughout the space. Remove the 208-volt 100-amp 40-circuit SQ-D panel from the wall of the Vacancy and reinstall on the wall of the electrical room. Install the existing E-mon meter to monitor usage on the SQ-D Panel. Disconnect and remove all low voltage wiring from small data room. (Assuming this feeds only the vacancy) Demo 16) fluorescent strip fixtures. Demo 5) 2x4 fluorescent fixtures. Demo 18) Can Lights. Demo 2) ceiling fans. Demo electric for 2) unit heaters. Remove all exit lights and remaining electrical from space as required. Disconnect and remove 13) 8-foot long fluorescent strip fixtures with 4) 4-foot T-8 fluorescent lamps. Demo 4) exit emergency lights. Disconnect and remove the electrical to 2) ceiling hung furnaces. Disconnect and remove all existing conduit and Boxes that are no longer needed and terminate back to the nearest junction box. Disconnect and remove all the electrical conduit that is installed on the block wall that is getting demolished. Reconnect necessary electrical and install back up on the demising wall. Furnish install and wire 31) Fixture A. Texas Fluorescents. 8-foot linear strip with 4) 18.5 w 40K LED tubes with Passive Infrared (PIR) Motion detector sensor mounted to the middle of the fixture at the Factory. Furnish install and wire 21) Fixture EM. Best Lighting. High output LED emergency light fixture RMR-16 Furnish install and wire 14) Fixture F1. ISOL E-3 Lighting. Pendant mounted Exit light. — Commercial Repair/Alter — ElectricalCity of Saint Paul$23,000
Install 3 new 24 ft light poles — Commercial New — ElectricalCity of Saint Paul$15,000
Permitted projects on public record. Addresses are omitted for privacy.