2 hr firewall between house and p.t structureTown of Falmouth · 2021
interior renovation to include 2 new offices, new parts dept, new bathroom in place in existing bathrooms, overhead door to be installed in rear and new window to be installed in office area, drop ceiling to be installed in hallway and offices. insulation to installed in ceiling, using existing flooring.Town of Falmouth · 2020
residential new. 4 bedroom colonial, rear deck, front farmers porch. **manual j and unit at sheet metal.**Town of Falmouth · 2016
''boat house'' construct additions to existing deck on north and south ends with egress stairs ***no change in occupancy**** applicant assumes responsibility for proceeding with work within the 20 day appeal period (see letter of 5/5/16 from brian bourque to james brandolini. application meets requirements and conditions per special permit (zba decision 023-16) . final construction control document received see notes/docsTown of Falmouth · 2016
raise appx 1642 sq ft of existing deck to same elevation as building floor, adjust north stair, replace south ramp with stair, create appx 13'2'' folding door opening in east elevation between building & deck ***as per conditions of site plan review - planning board sign-off before u&o*****Town of Falmouth · 2016
Permitted projects on public record. Addresses are omitted for privacy.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.