SOLAR INSTALLATIONCook County (suburbs) · 2026$34,407
REPLACEMENT OF TESLA POWERWALLS SOLARCook County (suburbs) · 2025$12,092
INSTALL ROOF MOUNTED SOLAR PV SYSTEM ENERGY STORAGE SYSTEMCook County (suburbs) · 2025$37,747
SOLAR INSTALLATIONCook County (suburbs) · 2025$34,407
SOLAR INSTALLATIONCook County (suburbs) · 2025$50,315
WORK TO BE DONE IN A STRIP MALL PARKING LOT WITH RETAIL, RESTAURANT AND OFFICE SPACES INSTALL 4 TESLA EV LITE SUPERCHARGER CABINETS INSTALL 16 TESLA V4 SUPERCHARGER POSTS INSTALL 1 UTILITY TRANSFORMER INSTALL 1 METER MOUNTED ON H-FRAME INSTALL 3 PEDESTRIAN LICook County (suburbs) · 2025$265,000
INSTALLATION OF A 14.35 KW ROOF-MOUNTED SOLAR 40.5 KWH ENERGY STORAGE SYSTEM.Cook County (suburbs) · 2024$55,949
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
SOLAR INSTALLATIONCook County (suburbs) · 2024
$22,988
INSTALLATION OF 3 TESLA CHARGING CABINETS, SWITCHGEAR, UTILITY TRANSFORMER AND METER TO BE INSTALLED OUTSIDE OF THE GARAGE. CHARGING POSTS TO BE INSTALLED ON THE LOWEST LEVEL OF THE PARKING GARAGE AS PER PLANSCook County (suburbs) · 2024$395,492
SOLAR INSTALLATIONCook County (suburbs) · 2024$22,988
INSTALLATION OF A 9.72 KW ROOF-MOUNTED SOLAR SYSTEMCook County (suburbs) · 2024$14,480
SOLAR INSTALLATIONCook County (suburbs) · 2024$19,792
Permitted projects on public record. Addresses are omitted for privacy.