Complete roofing system with ice and water across the entire roof.  GAF Timberline HDZ Shingles. 39 SQTown of Glastonbury · 2025$39,344
1.) Rising Star Roofing, LLC will pull the required building permit and facilitate allinspections.2.) Strip 1 layer of existing PVC roofing, down to the concrete decking. Allow concretedecking to dry as long as possible to promote better adhesion. Existing blocking willremain. (1,731 Sq Ft)4.) Install a polyiso tapered insulation system with 2 inches of base insulation and a ¼†perfoot taper. Insulation will be adhered with two-part adhesive.5.) Install Duro-Last 060mil PVC roofing membrane over both roof areas. Membrane will befully adhered.6.) Install 6†PVC gravel stop (160 LF) over the middle roof and 9†PVC gravel (100 LF) stopover the upper garage roof.7.) Sump in each roof drain location and install PVC outlets into each downspout.8.) Install one PVC retrofit drain over the upper garage roof.9.) Install accessories, flashing, and ventilation per manufacturers requirements as well asutilize Duro-Grip and Solvent Grip products per manufacturers requirements.Town of Glastonbury · 2025$29,300
Complete roofing system with ice andw ater across the entire roof. 21 SQ. GAF Timberline HDZ SHinglesTown of Glastonbury · 2024$33,000
Complete roofing system with ice and water across the entire roof. GAF Timberline HDZ Shingles.27 sq (3 FAMILY)Town of Bristol · 2024$24,900
Complete roofing system with ice and water across the entire roof. GAF Timberline HDZ Shingles.27 sq (3 FAMILY)
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.