Remove & dispose of existing Vaillant hot water boiler, gas burner and controls.Town of Simsbury · 2025
Remove & dispose of existing Vaillant hot water boiler, gas burner and controls.
Provide & install New Weil McLain Cga-4 gas boiler.
Reconnect to existing gas piping.
Provide & install four (4) zone valves with isolation valves in their existing locations.
Reuse existing thermostats.
Stainless steel liner to be installed by others.
Drain and fill system as needed.
Includes circulator, auto-feed, backflow preventor, low-water cut off and extrol tank.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. Please review our comments listed below. Conditions are subjected to field inspections.
1. Provide CO Detectors per IRC for alterations, repairs and additions. R315.2.2Town of Simsbury · 2025$13,900
gas air test 2nd floorTown of Bristol · 2025$195
gas air test 2nd floorTown of Bristol · 2025$195
Permitted projects on public record. Addresses are omitted for privacy.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.