Scope of Work: Kitchen remodel to include installation of new kitchen cabinets; replacement of insulation in one exterior kitchen wall and in basement walls; drywall replacement; painting; and flooring replacement. Electrical and plumbing work will be performed under separate permits, if required.Town of Bristol · 2026$43,000
Scope of Work: Kitchen remodel to include installation of new kitchen cabinets; replacement of insulation in one exterior kitchen wall and in basement walls; drywall replacement; painting; and flooring replacement. Electrical and plumbing work will be performed under separate permits, if required.Town of Bristol · 2026$43,000
*This should also include bathroom from 1/2 to full as per plans.
New Kitchen cabinets installed, new layout of kitchen. One non-bearing 2x4 wall. Electrical and Plumbing will pull own permits.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1.Provide Smoke and CO Detectors per IRC for alterations, repairs and additions. IRC R314.2.2, R315.2.2
2.Separate Electrical, Plumbing, and Mechanical permits may need to be applied for. If work in these areas are being updated/repaired, or altered. IRC R105.1
3. Separate permit for the kitchen cabinets is required R105.1
4.This approval is based on no structural work being done. Any relocation/removal of walls is assumed to be nonstructural. Any structural modifications, if required, shall be submitted to the building department for approval.Town of Simsbury · 2026$62,000
Alteration/Renovation-ResidTown of Simsbury · 2026
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Re-insulate walls 4' up from finish floor due to a water loss. The mitigation company removed drywall and insulation 4' up from finish floor. We will need the insulation inspected prior to drywall install.Town of Bristol · 2025
$5,500
Re-insulate walls 4' up from finish floor due to a water loss. The mitigation company removed drywall and insulation 4' up from finish floor. We will need the insulation inspected prior to drywall install.Town of Bristol · 2025$5,500
Permitted projects on public record. Addresses are omitted for privacy.