Installation of Oil fired boiler.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. Please review our comments listed below. Conditions are subjected to field inspections.
1.Provide c/o detectors on all habitable floors E315.2.2
2.Installation shall comply with the manufactures spec. M1401.1Town of Simsbury · 2026$16,326
Test Existing gas piping to allow it to be re endergized, has been shut down for 9 monthsTown of Bristol · 2025$900
Test Existing gas piping to allow it to be re endergized, has been shut down for 9 monthsTown of Bristol · 2025$900
Demo and rework of all existing plumbing, and drainage. FVP to install new fixtures include shut offs, sink, toliet.Town of Bristol · 2025$44,329
Demo and rework of all existing plumbing, and drainage. FVP to install new fixtures include shut offs, sink, toliet.Town of Bristol · 2025$44,329
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.