OL - 20 Bailey Hl Vill - Roof — NON STRUCTURAL RE-ROOFING The scope of work includes full roof replacement with site protection, tear-off, installation, and final inspection. All surrounding landscaping, exterior surfaces, and access areas will be protected, and safety measures will be implemented in compliance with OSHA standards. Existing roofing materials will be completely removed down to the deck, followed by inspection and replacement of any damaged sheathing as needed with homeowner approval. New roofing components will be installed, including underlayment, leak barriers at critical areas, drip edge, and all required flashings. The selected TimeLock™ Roofing System will then be installed according to manufacturer specifications, including proper fastening, alignment, and accessory installation such as vents and pipe boots. Ventilation will be verified and upgraded if needed, and all flashing and transition details will be completed to ensure a watertight, code-compliant system. The project concludes with daily cleanup, removal of debris and nails, and a final quality control inspection. Upon completion, the homeowner will receive warranty documentation, product registration, and a certificate of completion.Killingly CT · 2026$15,980
Permitted projects on public record. Addresses are omitted for privacy.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.