Removal of 4 2,500-gallon fuel oil underground storage tanks located between 110 and 177 Davis Drive. Tanks are assumed to be abandoned in place with flowable concrete fill. Any remaining product or sludge will be vacuumed from the tanks. Soil samples collected from the tank grave will be submitted for laboratory analysis of ETPH, VOCs, and PAHs. The tank graves will be backfilled to original grade with clean process fill and topsoil. Grass seed and hay mats will be applied.Town of Bristol · 2026$66,003
Removal of 4 2,500-gallon fuel oil underground storage tanks located between 110 and 177 Davis Drive. Tanks are assumed to be abandoned in place with flowable concrete fill. Any remaining product or sludge will be vacuumed from the tanks. Soil samples collected from the tank grave will be submitted for laboratory analysis of ETPH, VOCs, and PAHs. The tank graves will be backfilled to original grade with clean process fill and topsoil. Grass seed and hay mats will be applied.Town of Bristol · 2026$66,003
179 Wauregan - AC Glass - Tanks Removed — Removal and disposal of (4) 20000 gallon above ground storage tanksKillingly CT · 2024$44,220
50 No Frontage - UG Oil tank — Jackhammer asphalt / concrete over a 1000 gallon Underground Oil Tank. Backfill and replace asphalt / concreteKillingly CT · 2021$6,900
Permitted projects on public record. Addresses are omitted for privacy.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.