What the public permit record shows, not self-reported reviews.
Is ZAPARI ELECTRIC a real contractor?
ZAPARI ELECTRIC appears in public building-permit records with 7 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ZAPARI ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ZAPARI ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ZAPARI ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ZAPARI ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ZAPARI ELECTRIC's work?
The most recent permit on record for ZAPARI ELECTRIC is dated 2023-12-01, with 7 permits on file in total.
Cross street: CAMPBELL RANCH ROAD
Description of Work: 200 AMP ELECTRICAL PANEL UPGRADE FOR EXISTING SFD.San Diego County · 2022
Cross street: S GRANADA AVE
Description of Work: 200 AMP MSP UPGRADE FOR EXISTING SFDSan Diego County · 2021
Cross street: ROCOSO RD.
Description of Work: 200 AMP ELECTRICAL UPGRADE FOR EXISTING SFD.San Diego County · 2016
Park Name: BARRETT LAKE TRAILER PARK
Park I.D. No.37-0306 Space No.: WELL
Community: DULZURA
Description: INSTALL NEW 125 AMP METER POLE FOR WELL
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2023
Cross street: CARVALOS DR
Description of Work: MISC ELECT UPGRADE FROM 100 AMPS TO 200 AMPS FOR SFDSan Diego County · 2008
Cross street: SADDLE DRIVE
Description of Work: ELECTRICAL UPGRADE TO 200 AMP SERVICE - A NEW BOX WILL BE INSTALLED AND THE EXISTING BOX WILL BE USED AS A SUBPANEL.San Diego County · 2005
Cross street: AVOCADO & ROCKWOOD PL.
Description of Work:ELECTRIC UPGRADE TO 200 AMPS FOR SFD.-DED, 2/18/05.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ZAPARI ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.