What the public permit record shows, not self-reported reviews.
Is WEATHER MACHINES INC a real contractor?
WEATHER MACHINES INC appears in public building-permit records with 20 permits filed through 2020 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is WEATHER MACHINES INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to WEATHER MACHINES INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is WEATHER MACHINES INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. WEATHER MACHINES INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is WEATHER MACHINES INC's work?
The most recent permit on record for WEATHER MACHINES INC is dated 2020-07-13, with 20 permits on file in total.
CROSS STREET: Dont Know What Goes Here
Description of Work: HVAC Change Out - Split System - (Online Permit)
*This project must comply with the current Building Energy Efficiency Standards. Registered Title 24 forms must be provided to the inspector in the field.San Diego County · 2020
CROSS STREET: Description of Work: HVAC Change Out - FAU
Description of Work: HVAC Change Out - FAU or Wall Heater - (Online Permit)
*This project must comply with the current Building Energy Efficiency Standards. Registered Title 24 forms must be provided to the inspector in the field.San Diego County · 2020
CROSS STREET: HVAC Change Out
Description of Work: HVAC Change Out - Split System - (Online Permit)
*This project must comply with the current Building Energy Efficiency Standards. Registered Title 24 forms must be provided to the inspector in the field.San Diego County · 2018
CROSS STREET: HVAC Change Out
Description of Work: HVAC Change Out - Split System - (Online Permit)
*This project must comply with the current Building Energy Efficiency Standards. Registered Title 24 forms must be provided to the inspector in the field.San Diego County · 2017
CROSS STREET: Valle Vista Road
Description of Work: HVAC Change Out - Split System - (Online Permit)
*This project must comply with the current Building Energy Efficiency Standards. Registered Title 24 forms must be provided to the inspector in the field.San Diego County · 2015
CROSS STREET: Eucalyptus St
Description of Work: HVAC Change Out - Split System - (Online Permit)
*This project must comply with the current Building Energy Efficiency Standards. Registered Title 24 forms must be provided to the inspector in the field.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you WEATHER MACHINES INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to WEATHER MACHINES INC's website. It links to this profile so homeowners can see the public permit record behind your work.