What the public permit record shows, not self-reported reviews.
Is VIDEO VOICE DATA COMMUNICATIONS a real contractor?
VIDEO VOICE DATA COMMUNICATIONS appears in public building-permit records with 13 permits filed through 2025 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is VIDEO VOICE DATA COMMUNICATIONS's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to VIDEO VOICE DATA COMMUNICATIONS by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is VIDEO VOICE DATA COMMUNICATIONS licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. VIDEO VOICE DATA COMMUNICATIONS has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is VIDEO VOICE DATA COMMUNICATIONS's work?
The most recent permit on record for VIDEO VOICE DATA COMMUNICATIONS is dated 2025-07-08, with 13 permits on file in total.
CROSS STREET: Via Loma and Gird Rd
Description of Work: Existing Residential Main Electrical Service Upgrade - 100A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2023
CROSS STREET: FOOTHILL DR
DESCRIPTION: CELL SITE MODIFICATION FOR "DISH WIRELESS" TO INCLUDE:
TOWER SCOPE OF WORK
INSTALL (3) PROPOSED PANEL ANTENNAS (1 PER SECTOR)
INSTALL (1) PROPOSED COMMSCOPE MC-K6MHDX-9-96 T-ARM MOUNT ASSEMBLY
INSTALL PROPOSED JUMPERS
INSTALL (6) PROPOSED RRU'S (2 PER SECTOR)
INSTALL (1) PROPOSED OVER VOLTAGE PROTECTION DEVICE (OVP)
INSTALL (1) PROPOSED HYBRID CABLE
GROUND SCOPE OF WORK
INSTALL (1) PROPOSED CONCRETE PAD
INSTALL (1) PROPOSED UNDERGROUND CONDUIT FOR HYBRID CABLE
INSTALL (1) PROPOSED PPC CABINET
INSTALL (1) PROPOSED EQUIPMENT CABINET
INSTALL (1) PROPOSED POWER CONDUIT
INSTALL (1) PROPOSED TELCO CONDUIT
INSTALL (1) PROPOSED TELCO- FIBER BOX
INSTALL (1) PROPOSED GPS UNIT
INSTALL (1) PROPOSED SAFETY SWITCH (IF REQUIRED)
INSTALL (1) PROPOSED FIBER NID (IF REQUIRED)
INSTALL (1) PROPOSED 200 AMP METER WITH DISCONNECTSan Diego County · 2023
Install 2 dual-port level 2 ev charging stations on the parking lot.Sacramento County · 2022$40,000
Cross street: CAMINO DEL ARROYO
Description of Work: MISC ELECTRICAL TO REPAIR DAMAGED ELECTRICAL CABINET FOR "ST MARK EXECUTIVE GOLD COURSE"San Diego County · 2021
Cross street: PALA MESA
Description of Work: MISC ELEC CATV METER PEDASTAL FOR SPECTRUM/CHARTERSan Diego County · 2019
Area served
City of Sacramento, Sacramento County, San Diego County
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you VIDEO VOICE DATA COMMUNICATIONS?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to VIDEO VOICE DATA COMMUNICATIONS's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Cross street: MAGARIAN RD
Description of Work: NEW 100 AMP METER PEDESTAL FOR CHARTER COMMUNICATIONS
San Diego County · 2018
Cross street: Reche Rd
Description of Work:100 amp Meter Pedestal to be relocated apd 25' too the new steel pole for Charter Communications excavation permit number dpw2018-rwexcp-71959San Diego County · 2018
Cross street: Falabella
Description of Work: New 100 amp meter pedestal in private road for TVVC CommunicationsSan Diego County · 2017
Installation of twenty-five (25) dual-port EV chargers and one (1) single-port EV chargers for (51) EV charging stalls. Installation of two (2) 200A panelboards for EVCS loads.Sacramento County · 2025$332,452
EPC Submittal - Installation of four (4) electric vehicle charging stations. Installation of 75KVA transformer and 225A panel.
This project is to be completed under COM-1918234City of Sacramento · 2019$53,000
Installation of (4) dual-port EVC stations @ north parking stallsCity of Sacramento · 2019$44,857
REVISION TO COM-1817140 to upgrade transformer and add conduit runs for future EVC stations.City of Sacramento · 2018
Permitted projects on public record. Addresses are omitted for privacy.