What the public permit record shows, not self-reported reviews.
Is THE GREEN STORE INC DBA GR8 ENERGY a real contractor?
THE GREEN STORE INC DBA GR8 ENERGY appears in public building-permit records with 24 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is THE GREEN STORE INC DBA GR8 ENERGY's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to THE GREEN STORE INC DBA GR8 ENERGY by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is THE GREEN STORE INC DBA GR8 ENERGY licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. THE GREEN STORE INC DBA GR8 ENERGY has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is THE GREEN STORE INC DBA GR8 ENERGY's work?
The most recent permit on record for THE GREEN STORE INC DBA GR8 ENERGY is dated 2023-05-30, with 24 permits on file in total.
Cross Street: PINE ST
Description of Work: 11KW GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFDSan Diego County · 2023
Cross Street: SARAH ANN DR
Description of Work: GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFDSan Diego County · 2023
CROSS STREET: Anthony Rd.
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: Fury Ln.
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: Trunorth
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: Hannalei Dr.
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you THE GREEN STORE INC DBA GR8 ENERGY?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to THE GREEN STORE INC DBA GR8 ENERGY's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2022
CROSS STREET: Chestnut St.
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: E. Vista Way
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: Elfin Forest Rd.
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: Quail Canyon Rd.
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: Birch Ave.
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: Birch Ave.
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 225A - (ONLINE PERMIT)
*The scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels.
This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2021
Permitted projects on public record. Addresses are omitted for privacy.