What the public permit record shows, not self-reported reviews.
Is SPEARS CONSTRUCTION a real contractor?
SPEARS CONSTRUCTION appears in public building-permit records with 20 permits filed through 2018 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SPEARS CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SPEARS CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SPEARS CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SPEARS CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SPEARS CONSTRUCTION's work?
The most recent permit on record for SPEARS CONSTRUCTION is dated 2018-09-20, with 20 permits on file in total.
Cross street: JAPATUL VLY RD Foundation: SLAB
Description of Work: 2508 SQ FT SFD W/552 SQ FT ATT GARAGE & 684 SQ FT COV ENTRY/PATIOS W/ELECT W/ 200 AMP MSP AND TEMP POWER
8-7-2019 PLAN CHANGE SEE C OF A AW
12-13-18: TEMP POWER REMOVED FROM PERMIT; SEE C OF A SEE COMMENT. CDC
8-8-2018 PLAN CHANGE SEE C OF A . AWSan Diego County · 2018
Cross street: HIDE PARK
Description of Work: SFD DEMOLITION PERMIT --
NOTE: _ IT MAY NOT BE POSSIBLE TO REBUILD. _ The fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not "grandfather" its use if it is removed. Please see the Zoning counter at the Kearny Mesa PDS offices (5510 Overland Ave., Suite 110) for more information.San Diego County · 2018
Cross street: Woodside
Description of Work: Tenant improvement to existing 2 suites 7357 sq ft building with new additions of 98 sq ft for a total of 7455 sf - to create 2 suites (vacant) tenants to do their own ti's, removing 212 lineal feet of interiot paritions from existing and add ing 6 new exterior doors.Add new 1200 amp Elec Panel and add House Meter for exterior lights. New suites as follows:
Suite 1 - 1753 sq ft suite existing retail, adding 36 sq ft pop out drive thru window- and adding 61 lineal feet of interior partitions and 71 lineal feet of demising wall. new 43 sq ft front door (tenant to do ti) for a total of 1789 sq ft
Suite 2 --5485 sq ft - adding 62 sq ft for (fill in pop out) and 80 lineal feet of demising wall for a total of 5547 and electrical room ft
9-16-2011 Plan change removing hvac, electrical panel b c & E removed and the gas line to feed are not being done.
8/24/11 - Add testing power per JRA. Valid for 30 days. TGB
08/18/11 Plan Change add elec see C of A...VMD
6-2-2011 Plan change to foundation and framing vam.
5-11-2011 - Plan change to adjust sq footages. vam
04.28.2011: plan change see conditions of approval..LHGSan Diego County · 2011
Cross street: WOODSIDE AVE.
Description of Work: TI to add 8' racking system to new Walgreens
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SPEARS CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SPEARS CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2009
Cross street: WOODSIDE AVE.
Description of Work: TI to existing vacant building (Albertsons) for new Walgreens. 14550 sq ft - adding interior partitions to create office, pharmacy, general stock room, employee room, mens and womens restrooms, electrical equipment room. Misc electrical plumbing and mechanical. (THIS PERMIT CANNOT BE ISSUED UNTIL 1017-20080105 HAS BEEN ISSUED AND FINALED -- 5/18/09...OK PER JRA TO ISSUE PERMIT...VMT)
7-15-09 pLAN CHANGE SEE CONDITIONS OF APPROVAL VAM.
7/10/2009: ADDED TESTING GAS - GOOD FOR 30 DAYS OK PER JRA-1DED
7/1/09: ADDED TESTING POWER GOOD FOR 30 DAYS OK PER JRA. 1SRSSan Diego County · 2009
Cross street: WOODSIDE AVE.
Description of Work: EXTERIOR FACADE WORK OF EXISTING COMMERCIAL BUILDING INCLUDING ADD STONE VENEER TO EXISTING COLUMNS, NEW STUCCO ON EXISTING BUILDING, REPLACE ALL STORE FRONT WINDOWS, NEW ROOF DIAPHRAGM & PARAPET AT NEW CANOPY, NEW ROOF DRAINS & VENTS, GAS LINE RELOCATION & NEW EXTERIOR LIGHTING. NEW STUCCO & STONE VENEER AT ATM MACHINE, NEW TRASH ENCLOSURE AT REAR OF BUILDING & NEW MONUMENT SIGN & PARKING LOT ENTRY SIGN. DEMO SIDEWALKS & REPLACE WITH NEW ADA COMPLIANT & RE-STRIPE PARKING LOT & NEW ACCESSIBLE PATH OF TRAVEL FOR "LAKESIDE COMMERCIAL CENTER" TEMP POWER FOR SUITE 9748 WINTERGARDENS BLVD TO BE USED BY SITE SUPERINTENDENT
2-17-09 Plan change see conditions of approval vamSan Diego County · 2009
Cross street: WOODSIDE AVE.
Description of Work: REMODEL OF EXISTING VACANT SPACE (PREVIOUSLY ALBERTSONS) & FACADE INCLUDING DEMO OF 6650 SQFT OF BUILDING, COMPLETE STRL. RE-ROOF OF BUILDING, ADD NEW 150 L.F. DEMISING WALL TO CREATE 2 SHELL SUITES (FUTURE RETAIL) (STE. 101 & 102), REMOVE ALL EXTERIOR CANOPIES & REBUILD NEW CANOPIES & FURRED OUT PILASTER WALLS, DEMO LOADING DOCKS AND REBUILD NEW LOADING DOCKS WITH RAMPS,196 SQFT OF ATTIC SPACE (TO HOUSE FUTURE EQUIPMENT) OVER SUITE 102, 819 SQFT OF NEW RAISED ROOF OVER SUITE 101, & NEW BUILT UP ROOF MEMBRANE OVER ENTIRE BUILDING. MISC. EXTERIOR ELEC. & MISC. PLUM. FOR GAS LINES & ROOF DRAINS 8' HIGH CMU TOTE ENCLOSURE (320 SQ FT)
AND 232 SQ FT CMU WALL FOR TRASH COMPACTOR ENCLOSURE.
6-10-09 Plan change see conditions of approval vam.
4/1/09: PLAN CHANGE SEE CONDITIONS OF APPROVAL FOR DETAILS. 1SRS
5/15/09: STRL ONLY PLAN CHANGE - SPECIFY CLASS "A" BUILT-UP ROOFING ASSEMBLY WITH A COOL ROOF CAP SHEET. NO NEW PLAN SHEETS, SEE STAMPED 8 1/2 x 11 ROOF ASSEMBLY SHEETS. ASSEMBLY TO BE GAF BUR SYSTEM NO. 22 FROM ICC REPORT#1274 WITH COOL ROOF CAP SHEET CRRC PRODUCT ID 0676-0021...1KWMSan Diego County · 2009
Cross street: Clemens Ln
Description of Work: Installing new shelving units for new Walgreens Store.San Diego County · 2008
Cross street: Clemens Ln
Description of Work: Reinforce existing 218.5 lineal feet retaining wall (west)San Diego County · 2008
Cross street: Clemens Ln Foundation: SLAB
Description of Work: 10000 sq ft Walgreens Store - consisting of pharmacy w/patient seating, mens & womens ada restrooms, storage(stock room), employee breakroom, locker room, office, walk in coolers, 1hr photo lab and general sales floor. 143 sq ft exterior storage (g20) and 170 sq ft trash enclosure (not covered)San Diego County · 2008
Cross street: Woodside
Description of Work: Tenant improvement to existing 2 suites 7357 sq ft building with new additions of 98 sq ft for a total of 7455 sf - to create 2 suites (vacant) tenants to do their own ti's, removing 212 lineal feet of interiot paritions from existing and add ing 6 new exterior doors. New suites as follows:
Suite 1 - 1753 sq ft suite existing retail, adding 36 sq ft pop out drive thru window- and adding 61 lineal feet of interior partitions and 71 lineal feet of demising wall. new 43 sq ft front door (tenant to do ti) (no epm) for a total of 1789 sq ft
Suite 2 --5485 sq ft - adding 62 sq ft for (fill in pop out) and 80 lineal feet of demising wall for a total of 5547 (no epm) and electrical room ft
5-11-2011 - Plan change to adjust sq footages. vam
04.28.2011: plan change see conditions of approval..LHGSan Diego County · 2010
Cross street: Woodside Ave
Description of Work: Misc electrical for installation of "Listed" cardboard baler.San Diego County · 2009