What the public permit record shows, not self-reported reviews.
Is SOLIRVINE LLC a real contractor?
SOLIRVINE LLC appears in public building-permit records with 7 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SOLIRVINE LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SOLIRVINE LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SOLIRVINE LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SOLIRVINE LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SOLIRVINE LLC's work?
The most recent permit on record for SOLIRVINE LLC is dated 2023-07-10, with 7 permits on file in total.
CROSS STREET: N Mesa Dr
Description of Work: Existing Residential Main Electrical Service Upgrade - 400A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2023
Cross Street:: ADAMS DR
Description of Work: 14 KW GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFDSan Diego County · 2022
Cross Street: E MISSION RD
Description of Work: 6 KW GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD
11/18/2021: PLAN CHANGE SEE C OF A FOR DETAILS // EFMSan Diego County · 2021
CROSS STREET: Yettford Rd
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT)
*The scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels.
This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2020
Cross Street: EL SECRETO
Description of Work: GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFDSan Diego County · 2020
CROSS STREET: N Mesa Dr
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SOLIRVINE LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2023
CROSS STREET: Cantaranas
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT)
*The scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels.
This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2020
Permitted projects on public record. Addresses are omitted for privacy.