What the public permit record shows, not self-reported reviews.
Is SOLION CONSTRUCTION a real contractor?
SOLION CONSTRUCTION appears in public building-permit records with 5 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SOLION CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SOLION CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SOLION CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SOLION CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SOLION CONSTRUCTION's work?
The most recent permit on record for SOLION CONSTRUCTION is dated 2023-11-29, with 5 permits on file in total.
CROSS STREET: xxx
Description of Work: (Online Permit) RESIDENTIAL ELECTRIC VEHICLE CHARGING STATION(S) (TOTAL OF 1 STATIONS) FOR EXISTING SFDSan Diego County · 2023
CROSS STREET: xxx
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
CROSS STREET: xxx
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2021
CROSS STREET: xxx
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2023
CROSS STREET: xxx
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SOLION CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SOLION CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.