What the public permit record shows, not self-reported reviews.
Is SKYWAY ELECTRIC COMPANY a real contractor?
SKYWAY ELECTRIC COMPANY appears in public building-permit records with 22 permits filed through 2016 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is SKYWAY ELECTRIC COMPANY's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to SKYWAY ELECTRIC COMPANY by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is SKYWAY ELECTRIC COMPANY licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. SKYWAY ELECTRIC COMPANY has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is SKYWAY ELECTRIC COMPANY's work?
The most recent permit on record for SKYWAY ELECTRIC COMPANY is dated 2016-12-01, with 22 permits on file in total.
CROSS STREET: SWEETWATER SPRINGS BLVD
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2016
CROSS STREET: D STREET
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.
11/16/2016: PLAN CHANGE: SEE COFA...T.T.
10/18/2016: PLAN CHANGE: SEE COFA....T.T.San Diego County · 2016
CROSS STREET: N LAKE WOHLFORD RD
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2016
CROSS STREET: DEODAR ST
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2016
CROSS STREET: BEARCAT LN
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.
Area served
City of San Jose, City of Vallejo, San Diego County
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you SKYWAY ELECTRIC COMPANY?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to SKYWAY ELECTRIC COMPANY's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2016
CROSS STREET: QUAIL DR
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 125A - (ONLINE PERMIT)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2016
CROSS STREET: ROBINWOOD DR
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 125A - (ONLINE PERMIT)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2016
CROSS STREET: HANSON LN
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2016
Sub-Trades OnlyCity of San Jose · 2015
PLEASE ENTER THE NEAREST CROSS STREET:__Grandview Dr
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2014
PLEASE ENTER THE NEAREST CROSS STREET:___Lakeview Rd
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2014
PLEASE ENTER THE NEAREST CROSS STREET:_______________
12-17-14 PLAN CHANGE: REMOVED SUBPANEL CHANGED INVERTERS...SEE COA TLH
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2014
Permitted projects on public record. Addresses are omitted for privacy.