What the public permit record shows, not self-reported reviews.
Is PEACE OF MIND ELECTRIC a real contractor?
PEACE OF MIND ELECTRIC appears in public building-permit records with 33 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is PEACE OF MIND ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to PEACE OF MIND ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is PEACE OF MIND ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. PEACE OF MIND ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is PEACE OF MIND ELECTRIC's work?
The most recent permit on record for PEACE OF MIND ELECTRIC is dated 2023-11-09, with 33 permits on file in total.
CROSS STREET: Southern Oak Dr
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2023
CROSS STREET: Pepper Dr
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2023
CROSS STREET: Ramona Oaks Rd
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2022
Cross Street: LAKETREE DR
Description of Work: 7 KW ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.San Diego County · 2020
Cross Street: NECTAR
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you PEACE OF MIND ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to PEACE OF MIND ELECTRIC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2019
Cross Street: MOON RIDGE
Description of Work: GROUND MOUNT COMMERCIAL SOLAR PV
TOTAL SYSTEM SIZE IN KILOWATTS: 26
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.San Diego County · 2019
Cross Street: RIO VERDE DR
Description of Work: 7KW ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD
06-18-19 PLAN CHANGE: SEE COA TLH
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.San Diego County · 2019
Cross Street: EL NIDO DR
Description of Work: 8KW ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD w/ PANEL UPGRADE FROM 100 AMP TO 200 AMP
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.San Diego County · 2017
Cross Street: BRENMAN WAY
Description of Work: GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFDSan Diego County · 2017
CROSS STREET: Saddle Bred Lane
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2016
Cross Street: VALLEY LIGHTS DR
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.San Diego County · 2016
Cross Street: new ranch rd
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.
06/25/2019 PERMIT RENEWED AT 25%, MUST RECEIVE AN INSPECTION WITHIN THE 180 DAYS (12/22/2019) TO KEEP THE PERMIT ACTIVESan Diego County · 2016
Permitted projects on public record. Addresses are omitted for privacy.