What the public permit record shows, not self-reported reviews.
Is MULVEY CUSTOM BUILDERS INC a real contractor?
MULVEY CUSTOM BUILDERS INC appears in public building-permit records with 42 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MULVEY CUSTOM BUILDERS INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MULVEY CUSTOM BUILDERS INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MULVEY CUSTOM BUILDERS INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MULVEY CUSTOM BUILDERS INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MULVEY CUSTOM BUILDERS INC's work?
The most recent permit on record for MULVEY CUSTOM BUILDERS INC is dated 2023-06-12, with 42 permits on file in total.
CROSS STREET: South Lane
Description of Work: Existing Residential Main Electrical Service Upgrade - 400A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2023
Cross street: HIGHLAND DR
Description of Work: 1256 SQFT 2-STORY ADDITION (TO INCLUDE CHANGE OF EXISTING DET. GUEST SUITE TO ATTACHED OFFICE) AND INTERIOR REMODEL (TO INCLUDE 497 LF OF INTERIOR PARTITIONS ADDED/REMOVED AND 600 SQFT OF WINDOWS/DOORS) FOR EXISTING SFD
9/2/22 PLAN CHANGE SEE COA ALA
01/07/2022: OKAY TO ISSUE THIS PERMIT WITH A PC INVALID EXPIRED STATUS DUE TO RELATED ISSUES THAT COVID HAS CAUSED WHICH SLOWED DOWN ALL REVIEW PROCESSES INTERNAL AND EXTERNAL TO THE COUNTY - EXPIRATION DATE 07/04/2022. AMC
7/30/21: PLAN CHECK EXTENDED DUE TO COVID 19, PERMIT EXPIRES ON 1/6/22 - AH
12/23/2020: COURTESY PLAN CHECK EXTENSION FOR 180 DAYS GRANTED DUE TO RELATED ISSUES THAT COVID HAS CAUSED WHICH SLOWED DOWN ALL REVIEW PROCESSES INTERNAL AND EXTERNAL TO THE COUNTY - VALID UNTIL 07/04/2021 - KESan Diego County · 2022
Cross street: DATE LN
Description of Work: INTERIOR REMODEL TO INCLUDE 166 LF NEW/DEMO'D INTERIOR PARTITIONS, 646 SQFT WINDOWS/DOORS, 88 SQFT INFILL & 1047 SQFT SIDING W/ MISC EPM FOR EXISTING SFD
12/09/2021 - Permit Renewed via script by Tam Vo COURTESY PERMIT EXTENSION GRANTED DUE TO RELATED ISSUES THAT COVID HAS CAUSED. MUST HAVE A VALID INSPECTION EVERY 180 DAYS FOR PERMIT TO REMAIN ACTIVE.San Diego County · 2020
Cross street: FLORES DE ORO
Description of Work: 1984 SQFT ADDITION TO FIRST FLOOR, 257 SQFT GLQ ON SECOND FLOOR, 628 SQFT GARAGE ADDITION, 78 SQFT STORAGE ADDITION, 1211 SQFT PATIO COVER, AND INTERIOR REMODEL (TO INCLUDE 416 LF OF INTERIOR PARTITIONS) FOR EXISTING SFD
11/23/2020:COURTESY PLAN CHECK EXTENSION FOR 180 DAYS GRANTED DUE TO RELATED ISSUES THAT COVID HAS CAUSED WHICH SLOWED DOWN ALL REVIEW PROCESSES INTERNAL AND EXTERNAL TO THE COUNTY - VALID UNTIL 05/22/2021. bnSan Diego County · 2019
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MULVEY CUSTOM BUILDERS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MULVEY CUSTOM BUILDERS INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Cross street: FLORES DE ORO
Description of Work: REMOVE AND REPLACE EXISTING 100 LF RETAINING WALL W/ 1650 SQFT COUNTY STANDARD RETAINING WALLS (275 LF MAX HEIGHT 6', SLOPING BACKFILL)San Diego County · 2019
Cross street: EL MIRADOR
Description of Work: 804 SQFT SFD ADDITION AND INTERIOR REMODEL TO INCLUDE 101 LF OF WALL PARTITIONS, 199 SQFT OF WINDOWS/DOORS, 3364 SQFT RE-ROOF, 444 SQFT DET. GUEST LIVING QUARTERS, ENTRY GATE W/ ELECTRICAL ( MAX HEIGHT 5')
12-7-2018 PLAN CHANGE SEE C OF A AW
If a re-roof project is proposed, the following specifications apply.
Existing roofing material: CLAY TILES
Proposed roofing material: CLAY TILES
Manufacturer: -
Brand and model: -
Color (if cool roof required): -
Built-up roofing assembly system number per attached listing report (if applicable): N/A
Specific exemption from cool roof requirements (if applicable): -
Required building inspector field verification* (if applicable): YES
REMOVE EXISTING CLAY TILES
REPLACE THE UNDERLAYMENT- 2 LAYERS 30# FELT
RE-INSTALL THE EXISTING TILESSan Diego County · 2019
Cross street: FAIRBANKS Foundation: SLAB
Description of Work: 318 SF DETACHED WINE CELLAR W/ ELECTRICAL FOR (E) SFDSan Diego County · 2018
Cross street: DEL DIOS HWY
Description of Work: BLDG 5, SUITE 509 - 511 -- 4000 SQFT VACANT SUITE TO OFFICE SPACE FOR "ALETHEA CAPITAL MANAGEMENT, LLC" INCLUDING INTERIOR PARTITIONS TO CREATE 4 OFFICES, RECEPTION AREA, CONFERENCE ROOM, LOUNGE AREA W/ KITCHENETTE - 1 SINK, & STORAGE; T-BAR CEILING TREAMENT, LIGHTING POWER, NEW DUCTING FROM EXISTING MECH UNITS, MISC ELECTRICAL, PLUMBING & MECHANICAL.San Diego County · 2015
Cross street: Las Palomas
Description of Work: Minor interior remodel to include relocation of bedroom and kitchen, adding bathrooms, closet, and laundry room with 136 LF interior partitions (Misc EPM). Replaced/add 569 sqft windows and doors for existing SFD.San Diego County · 2014
Cross street: AVNDA DE ACACIAS Foundation: SLAB
Description of Work: 1200 SQFT 2ND DWELLING UNIT W/ AC & FS (LOCATED ABOVE DET GARAGE), 478 SQFT ADDITION TO EXISTING DETACHED FINISHED GARAGE, & 334 SQFT REC ROOM/POOL BATH & 209 SQFT WINE CELLAR (HABITABLE AREA; ATTACHED TO GARAGE), 200 AMP SERVICE.San Diego County · 2013
Cross street: AVNDA DE ACACIAS
Description of Work: 457 SQFT SFD ADDITION (MASTER BEDROOM CLOSET) W/ AC, 412 SQFT PATIO COVERS ( 280 SQFT LOGGIA), MISC ELECTRICAL & PLUMBING FOR OUTDOOR KITCHEN W/ BBQ & MASONRY PIZZA OVEN, OUTDOOR FIREPLACE.
09-05-13: PLAN CHANGE (REMOVE GROTTO) SEE C OF A...MAZ
3/15/13: PLAN CHANGE; SEE C OF A..VMTSan Diego County · 2013
Cross street: Paseo Delicias
Description of Work: 288 sqft SFD Addition (Dining room, Wetbar w/fridge and add to Wine Room), 343 sqft 'as-built' game room, w/129 sqft as-built mech room and Interior remodel to include: remodel masterbath/closet, relocate pantry and laundryroom, 100 LF Interior Partitions, 957 sqft Window Replacement to dual pane, 649 sqft of new deck area, tear down & rebuild 1419 sqft of deck, (HRA) 4537 sqft Reroof Replace Existing Concrete Tile and Conversion of 418 sqft of detached garage/storage to Guest Qrts, and 319 sqft TrellisSan Diego County · 2012
Permitted projects on public record. Addresses are omitted for privacy.