What the public permit record shows, not self-reported reviews.
Is MARK SENK INC DBA ORANGE SOLAR a real contractor?
MARK SENK INC DBA ORANGE SOLAR appears in public building-permit records with 4 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MARK SENK INC DBA ORANGE SOLAR's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MARK SENK INC DBA ORANGE SOLAR by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MARK SENK INC DBA ORANGE SOLAR licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MARK SENK INC DBA ORANGE SOLAR has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MARK SENK INC DBA ORANGE SOLAR's work?
The most recent permit on record for MARK SENK INC DBA ORANGE SOLAR is dated 2023-11-09, with 4 permits on file in total.
CROSS STREET: COYOTE RD
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2023
CROSS STREET: LEMON AVE
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: ROOF MOUNT RESIDENTIAL SOLAR PV WITH ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING PERMITTED STRUCTURES WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 225A - (ONLINE PERMIT)
*The scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels.
This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2023
CROSS STREET: MILLER RD
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2023
CROSS STREET: PINEHURST DR
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MARK SENK INC DBA ORANGE SOLAR?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MARK SENK INC DBA ORANGE SOLAR's website. It links to this profile so homeowners can see the public permit record behind your work.