What the public permit record shows, not self-reported reviews.
Is JACOBS ELECTRIC INC a real contractor?
JACOBS ELECTRIC INC appears in public building-permit records with 28 permits filed through 2017 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JACOBS ELECTRIC INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JACOBS ELECTRIC INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JACOBS ELECTRIC INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JACOBS ELECTRIC INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JACOBS ELECTRIC INC's work?
The most recent permit on record for JACOBS ELECTRIC INC is dated 2017-05-19, with 28 permits on file in total.
CROSS STREET: Kelli Street
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2017
CROSS STREET: Hartzel
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2016
CROSS STREET: Ave De La Madrid
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2016
CROSS STREET: Meadowridge
Description of Work: Existing Residential Main Electrical Service Upgrade - 125A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2016
Cross street: HIDDEN SPRINGS DR
Description of Work: ELECTRICAL UPGRADE FOR EXISTING SFDSan Diego County · 2013
Cross street:DUNBAR LN.
Description of Work: ***CEDAR FIRE***ON-GRID GROUND-MOUNTED SOLAR PHOTOVOLTAIC SYSTEM: 32 MODULES, 1 INVERTOR, 5.2 KW, FOR SFD UNDER CONSTRUCTION (PERMIT 1003, 20041348)San Diego County · 2007
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JACOBS ELECTRIC INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to JACOBS ELECTRIC INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Cross street: HARBISON CANYON RD.
Description of Work: HRA ON-GRID GROUND-MOUNTED SOLAR PV SYSTEM FOR SFD INCLUDING: 18 MODULES, 1 INVERTER, 2.5 KW.San Diego County · 2007
Cross street: WOODLAND LN.
Description of Work: HRA ROOF-MOUNTED ON-GRID SOLAR PV SYSTEM FOR SFD.San Diego County · 2007
Cross street: PEUTZ VALLEY ROAD
Description of Work: GROUND MOUNT SOLAR PHOTO VOLTAIC SYSTEM - 32 MODULES, 2 INVERTERS, 5 KW SYSTEM (HRA).
4/25/07: Slight revision of electrical single line. J1PSan Diego County · 2007
Park Name: RANCHO LOS COCHES
Park I.D. No.37-0735 Space No.: 33, 35, 36, 37, 38, 39,and 40
Map ref: 1232 E6
Community: LAKESIDE
Description: RELOCATE AND REPLACE 7 ELECTRIC PEDESTALS (SAME LOTS JUST IN BACK) FOR RV SPACES
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2014
Cross street: Marshall Rd
Description of Work: Upgrade electrical to 200 amp for existing sfdSan Diego County · 2010
Cross street: GREENFIELD DR.
Description of Work: SFD SVC UPGRADE TO 200 AMPSSan Diego County · 2010
Permitted projects on public record. Addresses are omitted for privacy.