What the public permit record shows, not self-reported reviews.
Is GLOBAL POWER GROUP INC a real contractor?
GLOBAL POWER GROUP INC appears in public building-permit records with 11 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is GLOBAL POWER GROUP INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to GLOBAL POWER GROUP INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is GLOBAL POWER GROUP INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. GLOBAL POWER GROUP INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is GLOBAL POWER GROUP INC's work?
The most recent permit on record for GLOBAL POWER GROUP INC is dated 2023-01-12, with 11 permits on file in total.
Cross street: STATE PARK RD
Description of Work: 20 AMP BREAKER ADDITION TO EXISTING PANEL FOR EXISTING SFDSan Diego County · 2023
Cross street: BALENTINE WAY
Description of Work: 48KW GENERATOR FOR EXISITNG SFDSan Diego County · 2021
Cross street: E MISISION RD
Description of Work: 24 KW GENERATOR FOR EXISITNG SFDSan Diego County · 2021
Cross Street: MAGNOLIA AVE
Description of Work: 3791 SQFT DETACHED CARPORT W/ COMMERCIAL ROOF MOUNT SOLAR PV ABOVE FOR HAPPY CAR WASH
NO. OF MODULES: 170
NO. OF INVERTERS: 2
TOTAL SYSTEM SIZE IN KILOWATTS: 68
12-26-19 SEE COMMENTS...TLH
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.San Diego County · 2019
Cross street: VIA DIEGUENOS
Description of Work: 38KW BACK-UP GENERATOR FOR EXISTING SFDSan Diego County · 2019
Cross Street:: RANGLELAND RD
Description of Work: GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFDSan Diego County · 2018
Cross street: HARPER RANCH RD.
Description of Work: BACK UP GENERATOR FOR EXISTING SFDSan Diego County · 2021
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you GLOBAL POWER GROUP INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to GLOBAL POWER GROUP INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Cross street: SKYLINE TRUCK TRAIL
Description of Work: MISC ELECTRICAL SERVICE UPGRADE FROM 60 AMPS TO 200 AMPS FOR EXISTING SFD
San Diego County · 2011
Cross street: HIGHLAND
Description of Work: SFD ELECT SERVICE UPGRADE TO 200 AMPSan Diego County · 2007
Cross street: FARMERS-VULCAN RD
Description of Work: ELECTRICAL ONLY TO UPGRADE FROM 200 TO 400 AMPS SERVICE FOR MOTOROLLA CELL SITE.San Diego County · 2006
Cross street: EL PASO ALTO
Description of Work: REMOVE EXISTING GENERATOR & REPLACE WITH NEW 30 KW GENERATOR FOR SDG&ESan Diego County · 2006
Permitted projects on public record. Addresses are omitted for privacy.