What the public permit record shows, not self-reported reviews.
Is DOIRE ELECTRIC a real contractor?
DOIRE ELECTRIC appears in public building-permit records with 11 permits filed through 2020 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is DOIRE ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to DOIRE ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is DOIRE ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. DOIRE ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is DOIRE ELECTRIC's work?
The most recent permit on record for DOIRE ELECTRIC is dated 2020-12-10, with 11 permits on file in total.
CROSS STREET: Sweetwater Springs Blvd
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2020
CROSS STREET: N Mollison Ave
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2020
Cross street: FUERTE DR
Description of Work: UPGRADING EXISTING 200A MAIN ELECTRIC PANEL ON AN EXISTING SFDSan Diego County · 2020
Cross street: VIA BELOTA
Description of Work: MISC ELECTRICAL FOR 125AMP MSP INSTALLATION FOR EXISTING SFD (DISCONNECT/RECONNECT)San Diego County · 2020
Cross street: SAN DIEGO ST.
Description of Work: 200 AMP UPGRADE FOR EXISTING SFD.San Diego County · 2018
Cross street: MELROSE LN
Description of Work: 125AMP MAIN SERVICE PANEL UPGRADE FOR (E) SFD.San Diego County · 2015
PLEASE ENTER THE NEAREST CROSS STREET:___Willow Rd.____________
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: Existing Residential Main Electrical Service Upgrade - 200 Amps - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you DOIRE ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2014
PLEASE ENTER THE NEAREST CROSS STREET:__Arnold Way___
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: Existing Residential Main Electrical Service Upgrade - 200 Amps - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2014
Cross street: W. Victoria
Description of Work: Adding one 20 amp circuit to existing electrical for microwave at Alpine Women's ClubSan Diego County · 2014
Cross street: GASKILL PEAK RD
Description of Work: **2020 FIRE** MISC ELECTRICAL TO REPLACE 100 AMP WELL METER FOR EXISTING SFD
**ADDRESS FOR METER IS 3410 "A" EMMANUEL WAY**San Diego County · 2020
Park Name: PANA RAMA MH ESTATES
Park I.D. No.37- 0951 Space No.: 119 Map ref: 1232D6
Community: LAKESIDE
Description: METER PEDESTAL & 100 AMP MSP UPGRADE FOR EXISTING UNIT IN MH PARK
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2020
Permitted projects on public record. Addresses are omitted for privacy.