What the public permit record shows, not self-reported reviews.
Is CSI ELECTRICAL CONTRACTORS INC a real contractor?
CSI ELECTRICAL CONTRACTORS INC appears in public building-permit records with 7 permits filed through 2022 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CSI ELECTRICAL CONTRACTORS INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CSI ELECTRICAL CONTRACTORS INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CSI ELECTRICAL CONTRACTORS INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CSI ELECTRICAL CONTRACTORS INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CSI ELECTRICAL CONTRACTORS INC's work?
The most recent permit on record for CSI ELECTRICAL CONTRACTORS INC is dated 2022-02-11, with 7 permits on file in total.
Cross street: CARRIZO CREEK RD
Description of Work: SFD & ACCESSORY STRUCTURE DEMOLITION PERMIT -- 37194 SQFT DEMOLITION
BUILDING 1 - 895 SQFT
BUILDING 2 - 1357 SQFT
BUILDING 3 - 5889 SQFT
BUILDING 5 - 2194 SQFT
BUILDING 6 - 3327 SQFT
BUILDING 7 - 3099 SQFT
BUILDING 8 - 1496 SQFT
BUILDING 10 - 2312 SQFT
AREA 4 - 16473 SQFT
MECHANICAS BAY - 152 SQFT
NOTE: _ IT MAY NOT BE POSSIBLE TO REBUILD. _ The fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not "grandfather" its use if it is removed. Please see the Zoning counter at the Kearny Mesa PDS offices (5510 Overland Ave., Suite 110) for more information.San Diego County · 2022
Sub-Trades OnlyCity of San Jose · 2019
Cross street: LOS COCHES
Description of Work: 80 SQ FT BATTERY STORAGE UNIT ADDITION WITH TESLA BATTERIES FOR EXISTING WALMART.San Diego County · 2019
Cross street: HWY 78
Description of Work: BATTERY ENGERY STORAGE SYSTEM FOR SUPERIOR CONCRETESan Diego County · 2019
Cross street:
Description of Work: BATTERY STORAGE UNIT FOR SUPERIOR CONCRETESan Diego County · 2019
Cross Street: OLIVE ST
Description of Work: RENEWABLE ENERGY SYSTEM - BATTERY BACK UP SYSTEM FOR MUSHROOM FACILITY (HOKTO KINOKO CO.)
OTHER RELEVANT SYSTEM SPECIFICATIONS: POWER PACK 2.0 UNIT
5-3-2019 PERMIT RENEWED AT 25% OF CURRENT FEES. MUST HAVE VALID INSPECITON WITHIN 180 CALENDAR DAYS - 10-30-2019San Diego County · 2018
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CSI ELECTRICAL CONTRACTORS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to CSI ELECTRICAL CONTRACTORS INC's website. It links to this profile so homeowners can see the public permit record behind your work.