What the public permit record shows, not self-reported reviews.
Is CERTIFIED ELECTRIC a real contractor?
CERTIFIED ELECTRIC appears in public building-permit records with 36 permits filed through 2021 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CERTIFIED ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CERTIFIED ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CERTIFIED ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CERTIFIED ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CERTIFIED ELECTRIC's work?
The most recent permit on record for CERTIFIED ELECTRIC is dated 2021-01-29, with 36 permits on file in total.
Replacing an old 100 amp zinsco main meter panel with a 200 amp new main meter panel surface mounted electrical panel, its located in the back yard going to the main pole no gas or down spots located within 3 feet in the circumference area of the panel.Sacramento County · 2021$2,500
Install a 100 amp,22kw, 350 btu, fixed generator with an automatic transfer switch, and add a 1-inch galvanized gas line from the existing main gas meter to the 22 kw generator. Setbacks for the generator will be 20 feet away from a neighbors house, 3 feet away from any combustible material in front of the generator on both sides, and 18 inches of clearance on the backside of the generator. the generator will be in the back yard 6 feet away from the house, and 6 feet away from the gate leading into the back yard. the generator will be bolted down with a 6inch long x 3/8 inch concrete self-taping bolt, concrete pad 3 inches deep by 23"wide x4' long concrete pad. the gas line and electrical will be trenched and will be 22 inches deep and the with separation of 12 inches between each other.Sacramento County · 2021$13,000
Cross street: TOPO LN / ACADIA
Description of Work: MISC ELEC - REPAIR WIND DAMAGED SERVICE PANEL, METER AND RISER ON SECOND LIVING UNIT.San Diego County · 2016
Cross street: RAMONA OAKS RD
Description of Work: REPLACE EXISTING 90A SUBPANEL WITH 70A SUBPANEL FOR EXISTING SFD.San Diego County · 2014
PLEASE ENTER THE NEAREST CROSS STREET:__abana ct
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: Existing Residential replacing 50A sub panel on exiting sfd with 200A msp - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.
Area served
City of Sacramento, City of San Jose, Sacramento County, San Diego County
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CERTIFIED ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to CERTIFIED ELECTRIC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2014
Cross street: San Vicente
Description of Work: 200 amp electrical service upgrade for existing SFDSan Diego County · 2014
Cross street: Spangler Park
Description of Work: Replacing 200 amp meter panel to existing SFD (Disconnect/Reconnect)San Diego County · 2013
Cross street:GAY RIO
Description of Work: MISC ELECT REPLACEMENT OF POOL LIGHT TIMER CIRCUTSSan Diego County · 2013
Cross street: ASHLEY
Description of Work: MISC ELEC TO REPLACE DAMAGED 200 AMP FOR EXISTING SFD
11/21/19 - PERMIT RENEWED AT 25% CURRENT FEES. RENEWAL VALID FOR ONE (1) YEAR -- MUST SCHEDULE AND COMPLETE A VALID BUILDING INSPECTION WITHIN 180 DAYS TO KEEP PERMIT ACTIVE. SEE COMMENTS IN COFA. -JN
04/18/16: -PERMIT RENEWED AT 25% CURRENT FEES. RENEWAL VALID FOR ONE (1) YEAR -- MUST SCHEDULE AND COMPLETE A VALID BUILDING INSPECTION WITHIN 180 DAYS TO KEEP PERMIT ACTIVE. SEE COMMENTS IN COFA. -DRWSan Diego County · 2012
Cross street: RESMAR RD
Description of Work: MISC ELECTRICAL FOR POOL PUMP.San Diego County · 2010
Sub-Trades OnlyCity of San Jose · 2009
SMUD / PG&E Safety Inspections are a one-time inspection. Additional inspections will cost $76.00 (Residential) or $152 (Commercial) each. If there is no access to the site or areas required by an Inspector, this will still be considered an inspection. Permit fees are non-transferable.City of Sacramento · 2018$200
Permitted projects on public record. Addresses are omitted for privacy.