What the public permit record shows, not self-reported reviews.
Is CDC COLE DAVIS CONSTRUCTION a real contractor?
CDC COLE DAVIS CONSTRUCTION appears in public building-permit records with 5 permits filed through 2021 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CDC COLE DAVIS CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CDC COLE DAVIS CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CDC COLE DAVIS CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CDC COLE DAVIS CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CDC COLE DAVIS CONSTRUCTION's work?
The most recent permit on record for CDC COLE DAVIS CONSTRUCTION is dated 2021-06-17, with 5 permits on file in total.
Cross street: ARTESIAN TRAIL Foundation: SLAB
Description of Work: 5326 SQFT SFD W/ 681 SQFT ATT GAR, 824 SQFT PATIO COVERS, 400 AMP MSP & TEMP POWER
6/17/2021: PLAN CHANGE. SEE C OF A FOR DETAILS - JN
Notice to Permittee: Temp power shall be inspected prior to framing inspection
1/20/21: PLAN CHECK EXTENSION VALID UNTIL 6/16/2021. HOSan Diego County · 2021
Cross street: Road to Rio Foundation: SLAB
Description of Work: 6150 sq. ft. single story sfd with 1080 sq. ft. attached garage, 620 sq. ft. 2nd du above garage, 760 sq. ft. attached covered patio with gasline for bbq, 1340 sq. ft. retaining wall (max 6'), fireplace in courtyard, 272sf attached trellis, 200amp service and Temp Power.
9/30/15-PLAN CHANGE: STRUCTURAL ONLY. MAZ
4/24/15-PLAN CHANGE: 2ND DU SQFT INCREASED...SEE C OF A-KP
Notice to Permittee: Temp power shall be inspected prior to framing inspectionSan Diego County · 2015
Cross street: PACO LAGO Foundation: SLAB
Description of Work: 9986 sqft 2 story sfd w/fs, ac and 1223 sq ft attached garage, 533 sf covered patios.
Notice to Permittee: Temp power shall be inspected prior to framing inspection
5/28/2014 Plan Change. Truss Calculations. See C of A... SS
12/17/13 Plan Change remove Guest Liv Qtr see C of A...VMDSan Diego County · 2014
Cross street: Camino De Arriba Foundation: SLAB
Description of Work: 6284 sq ft 2 story SFD w/ac, fs and attached finished 1044 sq ft garages. 1315 sq ft patios/verandas. 400 amp service
Notice to Permittee: Temp power shall be inspected prior to framing inspection
12/10/13 Plan Change Structural see C of A...VMD
11/13/13: Plan change; see c of a...vmt
10/03/13 Plan Change add sf see C of A...VMDSan Diego County · 2013
Cross street: Camino De Arriba
Description of Work: 900 sqft Retaining Wall (Part County Standard Sloping backfill and portion Engineered) max height 9'4" and 150 LF (4 walls)
(SFD under pds2013-RESPRI-000214)
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CDC COLE DAVIS CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to CDC COLE DAVIS CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.