What the public permit record shows, not self-reported reviews.
Is CARRION CONSTRUCTION INC a real contractor?
CARRION CONSTRUCTION INC appears in public building-permit records with 9 permits filed through 2018 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CARRION CONSTRUCTION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CARRION CONSTRUCTION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CARRION CONSTRUCTION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CARRION CONSTRUCTION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CARRION CONSTRUCTION INC's work?
The most recent permit on record for CARRION CONSTRUCTION INC is dated 2018-03-12, with 9 permits on file in total.
Cross street: LA VALLE PLATEADA Foundation: SLAB
Description of Work: 1376 S.F. DETACHED GUESTHOUSE.San Diego County · 2018
Cross street: RIO SENDA
Description of Work: (1) NEW FIREPLACE AND 2 (N) WINDOWS 98SQFT.San Diego County · 2018
Cross street: Rancho Bernardo Rd
Description of Work: 2138 SF Steel Patio Trellis Cover w/natural gas Patio heaters for outdoor dining over 2 existing patio's for 'MIGUEL'S COCINA'
4/23/15: Plan change -- strl only -- revise column connections; see c of a...vmtSan Diego County · 2015
Cross street: Del Dios Hwy
Description of Work: ): Minor Interior Kitchen Remodel to include remove 34 LF Int Wall replace w/header, Misc Elec/Plumb/Mech for existing sfd, new island and sink, change window/french door to folding door to single door in din rm. Added new folding door to existing living room.
01/14/15 RENEWED @25% OF CURRENT FEES...MUST CALL FOR A VALID INSPECTION WITHIN 180 DAYS...TLH
07/03/14 Renew Permit @ 25%...VMD MUST CALL FOR INSPECTION WITHIN 180 DAYS
7/31/13 Plan Change adding folding door. See C of A... SS
*07/22/13 Plan Change window/door to opening in din. rm see C of A...VMDSan Diego County · 2013
Cross street: Rancho Bernardo
Description of Work: 687 SQFT COVERED PATIO, MISC. PLUMBING FOR GAS LINES FOR 2 OUTDOOR FIREPITS & MISC. ELEC. FOR OUTDOOR LIGHTING FOR ZOCALO RESTAURANT
10-27-2011 Permit renewed at 25% of current fees. Permit must have valid inspection within 180 days of todays date to keep permit active. vam
7-27-2010 Permit renewed at 25% of current fees. Permit must have valid inspection with 6 months of todays date to keep permit active. vam
10/2/08: PLAN CHANGE SEE CONDITIONS OF APPROVAL FOR DETAILS. 1SRS
9-16-08 Plan change see conditions of approval.vamSan Diego County · 2008
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CARRION CONSTRUCTION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to CARRION CONSTRUCTION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Cross street: Rancho Bernardo Foundation: SLAB
Description of Work: 6938 sq ft multi level restaurant "Zocalo" with ac, fs consisting of two ada restrooms, cocktail bar, exhibitiion cooking area, kitchen, two employee areas and dining rooms. 330 sq. ft. outdoor service area.
9/22/08...PLAN CHANGE; SEE C OF A...VMTSan Diego County · 2007
Cross street: Rancho Bernardo
Description of Work: 687 SQFT COVERED PATIO, MISC. PLUMBING FOR GAS LINES FOR 2 OUTDOOR FIREPITS & MISC. ELEC. FOR OUTDOOR LIGHTING FOR ZOCALO RESTAURANT
10/2/08: PLAN CHANGE SEE CONDITIONS OF APPROVAL FOR DETAILS. 1SRS
9-16-08 Plan change see conditions of approval.vamSan Diego County · 2008
Cross street: Rancho Bernardo Foundation: SLAB
Description of Work: 6938 sq ft multi level restaurant "Zocalo" with ac, fs consisting of two ada restrooms, cocktail bar, exhibitiion cooking area, kitchen, two employee areas and dining rooms. 1592 sq ft trellis covered patio (outdoor dining), 330 sq. ft. outdoor service area.San Diego County · 2007
Cross street: Rancho Bernardo Foundation: SLAB
Description of Work: 7035 sq ft multi level restaurant "Zocalo" with ac, fs consisting of two ada restrooms, cocktail bar, exhibitiion cooking area, kitchen, two employee areas and dining rooms. 1630 sq ft trellis covered patio with outdoor fireplace (outdoor dining) and 2nd story deck (outdoor dining)San Diego County · 2006
Permitted projects on public record. Addresses are omitted for privacy.