What the public permit record shows, not self-reported reviews.
Is BRILLIANT ELECTRIC a real contractor?
BRILLIANT ELECTRIC appears in public building-permit records with 5 permits filed through 2019 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BRILLIANT ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BRILLIANT ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BRILLIANT ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BRILLIANT ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BRILLIANT ELECTRIC's work?
The most recent permit on record for BRILLIANT ELECTRIC is dated 2019-05-03, with 5 permits on file in total.
Park Name: PECAN PARK
Park I.D. No.37-0671 Space No.: 2 Map ref:
Community: EL CAJON
Description: REPLACING EXISTING PEDESTAL WITH NEW NO CHANGE IN POWER
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2019
Park Name: PECAN PARK MH ESTATES
Park I.D. No.37- 0671 Space No.: 11
Community: EL CAJON
Description: REPLACE ELECTRICAL METER PEDESTAL
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2019
Park Name: PECAN PARK M/H ESTATES
Park I.D. No.37- 0671 Space No.: 69 Map ref: 1232-G5
Community: EL CAJON
Description: REPLACE 50 AMP METER PEDESTAL W/ NEW 50 AMP METER PEDESTAL (NO UPGRADE).
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2014
Cross street: Lake Jennings
Description of Work: Misc Electrical Serivce panel upgrade to 200 amps for existing SFDSan Diego County · 2013
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BRILLIANT ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to BRILLIANT ELECTRIC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Park Name: PECAN PARK
Park I.D. No.37- 0671 Space No.: 28 Map ref:1232 G5
Community: EL CAJON
Description: REPLACE ELEC 100 AMP PEDESTAL FOR EXISTING MH
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2013
Permitted projects on public record. Addresses are omitted for privacy.