What the public permit record shows, not self-reported reviews.
Is BISHOP CONSTRUCTION a real contractor?
BISHOP CONSTRUCTION appears in public building-permit records with 7 permits filed through 2021 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BISHOP CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BISHOP CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BISHOP CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BISHOP CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BISHOP CONSTRUCTION's work?
The most recent permit on record for BISHOP CONSTRUCTION is dated 2021-06-08, with 7 permits on file in total.
Cross street: GOPHER CANYON RD Foundation: RAISED
Description of Work: 1188 SQFT DET MH AS ADU (SPA 18-17F) W/ 500 GAL LPT AND 200 AMP MSP FOR EXISTING SFDSan Diego County · 2021
Park Name: ALPINE OAKS ESTATES
Park I.D. No.37-0301 Space No.: 15
Community: ALPINE
Description: 840 SQ FT MH INSTALLATION (SPA 88-60 SYSTEM)
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2021
Cross street: SHOCKEY TRUCK TRAIL
Description of Work: 1708 SQFT MH ON PERMANENT FOUNDATION (SPA # 109-5F) WITH 10000 GAL WATER STORAGE, 500 GAL LPG, & 200 AMP MSPSan Diego County · 2020
Cross street: OLD HWY 80
Description of Work: 1600 SQFT MH (SPA # 109-5F) ON PRIVATE LOT AS SFD W/ 200 AMP MSP AND 250 GAL LPG TANKSan Diego County · 2020
Park Name: LAWRENCE WELKS COUNTRY CLB (AKA CHAMPAGNE VILLAGE)
Park I.D. No.37-0362
Space No.: 240
Map ref: 1089A2
Community: ESCONDIDO
Description: 1620 SQFT MH (SPA NO. 112-1F) W/ 720 SQFT AWNING (SPA NO. 88-60) IN EXISTING MH PARK
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BISHOP CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to BISHOP CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2020
Cross street: SUMMIT DR.
Description of Work: 1125 SQFT MH AS DET ADU (SPA NO. 109-5F) FOR EXISTING SFD.San Diego County · 2020
Cross street: PASO ROBLES LN Foundation: RAISED
Description of Work: 1200 SQ FT MANUFACTURED HOME AS AN ADU. 200 AMP UNDERGROUND FOR EXISTING SFDSan Diego County · 2020
Permitted projects on public record. Addresses are omitted for privacy.