What the public permit record shows, not self-reported reviews.
Is BARTON ELECTRIC a real contractor?
BARTON ELECTRIC appears in public building-permit records with 16 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BARTON ELECTRIC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BARTON ELECTRIC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BARTON ELECTRIC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BARTON ELECTRIC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BARTON ELECTRIC's work?
The most recent permit on record for BARTON ELECTRIC is dated 2023-04-12, with 16 permits on file in total.
CROSS STREET: West Lilac
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2023
CROSS STREET: West Lilac
Description of Work: ADVANCED ENERGY STORAGE SYSTEM FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT)
*The scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accommodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels.
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirement.San Diego County · 2023
Park Name: MINSUED MOBILE PARK
Park I.D. No.37- 0426 Space No.: SPACE 1-15 Map ref:
Community: VALLEY CENTER
Description: SDGE/STATE UTILITY UPGRADE PROGRAM. (15) ELECTRICAL METER PEDESTALS
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2022
Park Name: MINSUEND MOBILE PARK
Park I.D. No.37- 0426 Space No.: PARK SITE Map ref:
Community: VALLEY CENTER
Description: SDGE/STATE UTILITY UPGRADE PROGRAM. MISC ELECTRICAL SITE LIGHTING AND (2) METER PEDESTALS FOR COMMON AREAS
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BARTON ELECTRIC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2022
Cross street: PARADISE MT. RD.
Description of Work: O/H TO UNDERGROUND W/ 200 AMP MSP REPLACEMENT FOR EXISTING SFDSan Diego County · 2022
CROSS STREET: Quality Rd
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2021
Cross street: OLD RD
Description of Work: NEW 600 AMP PANEL TO REPLACE 2 EXISTING METERS FOR EXISTING GAS STATIONSan Diego County · 2018
CROSS STREET: Sunset Rd
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2016
CROSS STREET: Via Del Reina
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2016
Cross street: Valley Center Rd
Description of Work: New Elec for HOA for Ag Well
sepaate EXISTING 100 AMP AG WELL METER
**WELL ADDRESS IS 30913 'A' VALLEY CENTER ROAD**San Diego County · 2014
PLEASE ENTER THE NEAREST CROSS STREET:_sierra rojo
_____________DO_NOT_EDIT_BELOW_THIS_LINE_____________
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2014
Cross street: Camino Del Rey
Description of Work: 55 sqft Gate and 400 amp meter for Entry Gate and Landscaping
NOTE: ADDRESS FOR METER IS 30977 'A' VIA MARIA ELENA.
6/26/12: Ceritied Copy Plans -- .5 hrs of staff (TECH) time plus cost of copies...M1ASan Diego County · 2012
Permitted projects on public record. Addresses are omitted for privacy.