What the public permit record shows, not self-reported reviews.
Is BARNHART-REESE CONSTRUCTION INC a real contractor?
BARNHART-REESE CONSTRUCTION INC appears in public building-permit records with 22 permits filed through 2022 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BARNHART-REESE CONSTRUCTION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BARNHART-REESE CONSTRUCTION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BARNHART-REESE CONSTRUCTION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BARNHART-REESE CONSTRUCTION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BARNHART-REESE CONSTRUCTION INC's work?
The most recent permit on record for BARNHART-REESE CONSTRUCTION INC is dated 2022-05-10, with 22 permits on file in total.
Cross street: RANCHO BERNARDO ROAD
Description of Work: TENANT IMPROVEMENT ON SECOND FLOOR FOR "THORNMINT CORP CENTER" TO INCLUDE: 27 LF OF INT PARTITIONS ADDED TO CREATE AN OFFICE, INSTALL ROOF MOUNTED SPLIT SYSTEM, AND REPLACE PENDANT LIGHTING, MISC E/MSan Diego County · 2022
Cross street: RANCHO BERNARDO RD.
Description of Work: TI FOR THORNMINT CORPORATION TO INCLUDE DEMOING ALL INTERIOR WALLS TO CREATE 8 OFFICES, CREATE CONFERENCE ROOM, REMOVE DOUBLE DOORS, REMOVE 2 FIXED WINDOWS, REMOVE SHOWER ENCLOSURE, INSTALL 9 NEW DOORS, INSTALL CEILING AND LIGHT FIXTURES, MISC EPMSan Diego County · 2021
Cross street: CAMINO SAN BERNARDO
Description of Work: TENANT IMPROVEMENT TO CONVERT TO "MAKENA CONSULTING GROUP" TO INCLUDE NEW/REMOVED WALLS, WINDOWS/DOORS AND ADDING WALLS TO CREATE KITCHEN AREA AROUND EXISTING PLUMBING, CONFERENCE ROOM AND HALLWAY, MISC EPMSan Diego County · 2020
Cross street: NORTH WOODSIDE Foundation: SLAB
Description of Work: 42830 SQ FT 2 STORY BUILDING FOR AGC EAST COUNTY FACILITY CONSISTING OF WAREHOUSE, STORAGE, OFFICES, TRAINING ROOMS, RESTROOMS, ELEVATOR, JANITOR'S CLOSETS STAIRS CONFERENCE ROOMS, MISC EPM, 2000AMP SERVICE, 10 EXTERIOR PARKING LOT LIGHTS, MISC PARKING LOT BOLLARDS CHAIN LINK FENCE AROUND FACITLITY AND SLIDING GATE. TRASH ENCLOSURE W/COVER
10 PARKING LOT LIGHTS AND SEVERAL BOLLARDSSan Diego County · 2019
Cross street: NORTH WOODSIDE Foundation: SLAB
Description of Work: 42830 SQ FT 2 STORY BUILDING FOR AGC EAST COUNTY FACILITY CONSISTING OF WAREHOUSE, STORAGE, OFFICES, TRAINING ROOMS, RESTROOMS, ELEVATOR, JANITOR'S CLOSETS STAIRS CONFERENCE ROOMS, MISC EPM, 2000AMP SERVICE, 10 EXTERIOR PARKING LOT LIGHTS, MISC PARKING LOT BOLLARDS CHAIN LINK FENCE AROUND FACITLITY AND SLIDING GATE. TRASH ENCLOSURE W/COVER
TRASH ENCLOSURE WITH COVER
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BARNHART-REESE CONSTRUCTION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to BARNHART-REESE CONSTRUCTION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
San Diego County · 2019
Cross street: NORTH WOODSIDE Foundation: SLAB
Description of Work: 42830 SQ FT 2 STORY BUILDING FOR AGC EAST COUNTY FACILITY CONSISTING OF WAREHOUSE, STORAGE, OFFICES, TRAINING ROOMS, RESTROOMS, ELEVATOR, JANITOR'S CLOSETS STAIRS CONFERENCE ROOMS, MISC EPM, 2000AMP SERVICE, 10 EXTERIOR PARKING LOT LIGHTS, MISC PARKING LOT BOLLARDS . TRASH ENCLOSURE W/COVER
42830 SQ FT BUILDING 2 STORY 2000 AMP SERVICESan Diego County · 2019
Cross street: Camno Del Norte Foundation: SLAB
Description of Work: 5213 sq ft Dynamometer test facility (engine and vehicle testnig) for Hawthorne Machine Co. to inlcude 3 test bays and 1 control room, and exterior 9300 gal diesel fuel tank Misc epm
7-9-2016 Plan change adding detail for diesel fuel tank. vam see c of a vamSan Diego County · 2015
Cross street: Camino Del Norte
Description of Work: T.I improvement to install 20 ton bridge crane runway for Hawthorne Machinery.
4-4-2016 Plan change structural only vam see c of aSan Diego County · 2015
Cross street: Camino San Bernardo
Description of Work: Comm TI for 'National Food Group' to include 202 LF Interior Walls (remove and new) to create new Conference Rm, Janitor closet, new Entrance, Workrm,Shower Rm, remove wall in Kitchen, new Kitchen Hood, Interior Drywall, New Suspended T-Bar Ceiling, Misc Elec, Plumb, Mech, 50 SF Window relocationSan Diego County · 2014
Cross street: Mesamint
Description of Work: Tenant improvement to a 12, 213 sq ft vacant suite(office) (2 story)to create a Kid Ventures - removing l lf of interior paritions and adding lf of interior paritions to create 1 new restroom, 5 new storage rooms, two acitivity rooms, 2 gym activity spaces and new cafe. Misc electrical plumbing and mechanical for new bathroom and cafe.
4/16/13: Plan change; see c of a...vmtSan Diego County · 2013
Cross street: CAMINO SAN BERNARDO
Description of Work: 5491 SQFT COMM TI TO MAINSAVER SOFTWARE STE 200: INTERIOR REMODEL OF 70 LF INTERIOR PARTIONS TO BE REMOVED AND 297 LF AND REMOVE BATHROOM TO CREATE 11 OFFICES, BREAKROOM WITH NEW SINK, LOBBY AND SERVER ROOM, (EXISTING TO REMAIN 2 OFFICES, COPY ROOM, STORAGE AREAS (3) AND CONF. ROOM), REMOVE PORTION OF SUSPENDED CEILING GRID & TILES, MISC ELECT, PLUMB AND MECHSan Diego County · 2012
Cross street: CAMINO SAN BERNARDO
Description of Work:1233 SQFT TENANT IMPROVEMENT TO CONVERT PART OF EXISTING OFFICE OF MISSION FEDERAL FOR NEW STATE FARM INSURANCE OFFICE BY ADDING 46 LINEAL FEET OF INTERIOR PARTITION TO CREATE AN BREAKROOM AND MISC ELECTRICAL FOR RECEPTACLES.San Diego County · 2011
Permitted projects on public record. Addresses are omitted for privacy.