What the public permit record shows, not self-reported reviews.
Is ABSOLUTELY ELECTRIC INC a real contractor?
ABSOLUTELY ELECTRIC INC appears in public building-permit records with 34 permits filed through 2023 in and around San Diego County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ABSOLUTELY ELECTRIC INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ABSOLUTELY ELECTRIC INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ABSOLUTELY ELECTRIC INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ABSOLUTELY ELECTRIC INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ABSOLUTELY ELECTRIC INC's work?
The most recent permit on record for ABSOLUTELY ELECTRIC INC is dated 2023-09-22, with 34 permits on file in total.
CROSS STREET: Hubbard Lane
Description of Work: Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit)
*The scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted.San Diego County · 2023
Cross Street: TIERRA DEL SOL RD
Description of Work: 10KW GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURE.San Diego County · 2023
Park Name: SHANGRI LA MHP
Park I.D. No.37-0722 Space No.: CLUBHOUSE
Community: EL CAJON
Description of Work: ROOF MOUNT COMMERCIAL SOLAR PV
TOTAL SYSTEM SIZE IN KILOWATTS: 37
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.San Diego County · 2022
Park Name: LILAC OAK
Park I.D. No.37-0692
Community: VALLEY CENTER
Description of Work: BALLASTED GROUND MOUNT COMMERCIAL SOLAR PV
NO. OF MODULES: 139
NO. OF INVERTERS: 5
TOTAL SYSTEM SIZE IN KILOWATTS: 55
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2022
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ABSOLUTELY ELECTRIC INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ABSOLUTELY ELECTRIC INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Park Name: LILAC OAK
Park I.D. No.37-0692
Community: VALLEY CENTER
Description of Work: BALLASTED GROUND MOUNT COMMERCIAL SOLAR PV
NO. OF MODULES: 261
NO. OF INVERTERS: 10
TOTAL SYSTEM SIZE IN KILOWATTS: 104
10/28/2021: PLAN CHANGE. SEE C OF A FOR DETAILS
Per Section 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5' above the highest point of the existing roof.
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2021
Park Name: BUTTERFIELD RANCH
Park I.D. No.37-0381 Space No.: PARKSITE
Community: JULIAN
Description: 378KW GROUND MOUNT SOLAR
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2021
Park Name: LIVE OAKS SPRINGS RESORT
Park I.D. No.37- 0569 Space No.: PARK Map ref: 1299G3
Community: BOULEVARD
Description: REPLACEMENT ONLY 400 AMP AND 800 AMP ELECTRICAL SERVICE AND PEDESTALS REPLACEMENTS (TO INCLUDE SP. 1-3 , 23-26, AND 28-36) IN MH PARK
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2021
Park Name: MUSSEY GRADE VILLAGE PARK
Park I.D. No.371597-
Community:RAMONA
Description:GROUND MOUNT SOLAR FOR MUSSEY GRADE VILLAGE PARK
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2020
Park Name: BUTTERFIELD RANCH
Park I.D. No.37-0381 Space No.:PARK SITE CONSTRUCTION
Map ref:1138 B5
Community: JULIAN
Description: 300 KW GROUND MOUNT SOLAR FOR "BUTTERFIELD RANCH"
TO INCLUDE:
(779) MODULES
(2) INVERTERS
Note to permittee: ONCE THIS PERMIT IS ISSUED IT WILL BE VALID FOR SIX MONTHS. Work must commence and a valid inspection performed within six months of issuance. No extension shall be granted where work has not started prior to expiration of the initial permit. Upon payment of fees, a permit extension of six months may be granted. No permit shall be extended more than two years from issuance of the initial permit to construct.San Diego County · 2020
CROSS STREET: al bahr
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2020
CROSS STREET: Via Viejas
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2019
CROSS STREET: Oakley Rd
Description of Work: HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade).
This Permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements.
PerSection 4620 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. above the highest point of the existing roof.San Diego County · 2019
Permitted projects on public record. Addresses are omitted for privacy.