Remove and replace meter main, remove and replace interior sub panel. 200 amps like for like, overhead feedSacramento County · 2025$5,600
Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Remove 100 AMP surface mount, overhead feed replace with 200 amp and bring grounding up to code.Sacramento County · 2025$4,608
Remove & Replace Zinsko sub panel,Sacramento County · 2025$1,200
Mast revision from 8' to 10'
Permit number:PANR2024-00086 has already been completed. However, it turns out that the feeder that goes from the secondary pole to that 3 phase meter that controls the well & irrigation for the barn is too low and the trucks that deliver hay to the barn won’t fit under it. We need a disconnect from SMUD to revise and there are multiple meters on this property. This is for meter number:3382529. Location #2181021.Sacramento County · 2025$200
Re-attach disconnected carrier bob. Replace bent main mast and possibly replace jack.Sacramento County · 2025$1,850
Are you WHITTAKER ELECTRICAL REPAIR & INSTALLATION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Remove and replace 50 amp subpanel in condo unit. New panel to be rated at 100 amps for possible future upgrade by the HOA.Sacramento County · 2025
$1,650
Remove and replace 50 amp subpanel in condo unit. New subpanel will be rated up to 100 amps for future upgrade by HOA.Sacramento County · 2025$1,650
(Permit for main breaker change out APT #4)
**Applicant will have to get a change order on this permit if sub-panel needs to be replaced**
Replace the main breaker to determine if that is the problem. If not change out the sub panel.Sacramento County · 2024$500
Remove and replace zinsko surface mount panel 100 amp with 200 amp metered service. Overhead feed.Sacramento County · 2024$4,800
Remove and replace 100 amp metered service. "like for like." Underground feed inset into stucco wall. Panel is completely melted and is a fire hazard. Will also need stucco inspection for 3/22/24.Sacramento County · 2024$5,000
Replace panel. 100 amp to 200 amp. Overhead feed.Sacramento County · 2024$6,300
replacement of a 200 amp zinsko over head service . Mounted on a 20’ pole , the pole will be replaced as well .Sacramento County · 2024$9,000
Permitted projects on public record. Addresses are omitted for privacy.