Design and build 905SF 2-bedroom 2-bathroom ADU per plans with fire sprinklers. Solar to meet minimum requirements included.Panel Upgrade to 200 amp. REV01 we need a revision to put this sewer pump onto the plans. Easements added to site plan.Sacramento County · 2026$172,417
NEW 640SF ADU CONSTRUCTION. PANEL UPGRADE TO TWO 200 AMP PANELS ON HOUSESacramento County · 2026$108,218
WE ARE BUILDING A DETACHED ADU. 748 SQFT OF LIVING SPACE.Sacramento County · 2025$260,925
COMPLETE WRECK. DEMOLITION OF 258 SQ FT DETATCHED GARAGE.City of Sacramento · 2025$2,000
EPC - ADU 648 Sq Ft 2 bed 1 bath 1 kitchenette. Solar exempt.Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).
SEPARATE PERMIT TO BE ISSUED FOR DEMOLISH OFEXISTING STORAGE STRUCTURE.
revision RES-2511756 Site Plan Revision, adjusting electrical trench and Panel LocationCity of Sacramento · 2025$147,400
Permitted projects on public record. Addresses are omitted for privacy.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.