WoodSpring Suites Hotel Four stories REV01 Revision to approved and issued building permit plans - See change narrative for specific changes requested.
Owner Requested Changes
- Finish Schedule
- Foundation Plan
- Roof Framing Plan
- Elevator Shaft
- Door Schedules
- Plumbing (sump pump)
- Electrical (receptacle for sump pump)Sacramento County · 2026$10,030,905
Install new moisture barrier where removed and tie into existing. • Install new 3 coat stucco system where removed and tie into existing. • Hydrate new stucco per manufacturer’s specifications. • Prime all new stucco. • Paint new stucco with 2 coats of finish to match existing within industry standardsSacramento County · 2026$47,476
Alteration of existing monument signSacramento County · 2025$22,661
Sub Case to CBAC2023-00300
add height on existing fence, install new vehicular gate with entry control system; install new entry system at main entrance;Sacramento County · 2025$1
One of the meter breakers on the meter bank melted onto the bussing. We need to remove the single breaker, clean the bussing, and install a new breaker.
Mutual Housing Foothill FarmsSacramento County · 2025$2,000
Sub Case to CBAC2023-00300
new trash enclosures replacing existing
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Sub Case to CBAC2023-00300
Building interior and exterior work includes changing out all ceiling lights and installing occupancy sensors; changing out exterior wall lights; installing new fire devices; installing new flooring in the building lobby, kitchen, and main room; installing new kitchen cabinets and countertop; installing a new kitchen hood.
, CH01 - Deletion of a portion of exterior accessible path of travel to one entry at Bldg. B (Community Rm). Revision to access aisle at accessible parking adjacent to Bldg. B.Sacramento County · 2025$1
Main Case
Site work includes parking lot repaving and restriping; new sidewalks for path of travel; existing pool/hot tubs demo; pool equipment removal; new signage and monument installation replacing existing hotel neon signs; new trash enclosures replacing existing; site and exterior wall lights; add height on existing fence; replace exterior balcony metal rails; install new vehicular gate with entry control system; install new entry system at main entrance; paint building exterior.
Building Interior work includes new passenger elevator installation; lobby area remodel; existing office area reconfiguration; interior corridor ramp reconfiguration for accessibility compliance; building exterior door replacement; installation of full kitchen at all units; common area flooring replacement; new mailbox installation; new roof hatch installation; new mechanical units; mobility featured accessible unit alteration; communication featured accessible unit alteration; laundry room plumbing reconfiguration., CH01 - Revise plumbing pipe specification to include PEX pipes., CH02 - Relocated elevator & Reconstruction of interior ram, CH-03 - Change of room designations, Change of designation - Room 156 building C, CH-05 - Revisions to exterior path of travel: Revisions at paths to trash enclosures + additional detectable warnings., CH-06 - Repair existing truss for new attic access opening, CH07 - Revision to exterior path of travel to Community Garden, adjacent to Building C.Sacramento County · 2025$2,994,850
CH01 - Deletion of a portion of exterior accessible path of travel to one entry at Bldg. B (Community Rm). Revision to access aisle at accessible parking adjacent to Bldg. B.Sacramento County · 2025
CH07 - Revision to exterior path of travel to Community Garden, adjacent to Building C.Sacramento County · 2025
CH-06 - Repair existing truss for new attic access openingSacramento County · 2025
CH-05 - Revisions to exterior path of travel: Revisions at paths to trash enclosures + additional detectable warnings.Sacramento County · 2025
Permitted projects on public record. Addresses are omitted for privacy.