What the public permit record shows, not self-reported reviews.
Is STAPLES CONSTRUCTION a real contractor?
STAPLES CONSTRUCTION appears in public building-permit records with 7 permits filed through 2025 in and around Sacramento County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is STAPLES CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to STAPLES CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is STAPLES CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. STAPLES CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is STAPLES CONSTRUCTION's work?
The most recent permit on record for STAPLES CONSTRUCTION is dated 2025-03-15, with 7 permits on file in total.
THE SCOPE OF PROJECT IS TO RENOVATE AND MODIFY THE EXISTING MATHER FIRE STATION. PHASE 2 INCLUDES THE BUILD-OUT OF A KITCHEN, BUSINESS SPACES, STORAGE SPACE, AND THE INSTALLATION OF A NEW MECHANICAL SYSTEM. EXISTING ELECTRICAL, PLUMBING AND FIRE ALARM SYSTEMS WILL BE MODIFIED TO ACCOMMODATE THE NEW FLOOR LAYOUT. (SEE PERMIT CCBP2021-00006 FOR PHASE 1)Sacramento County · 2025$1,500,000
Grading for prefabricated restroom at Arcade Creek Park. Also, create ADA parking stalls and a path of travel to the restroom. Electrical, plumbing and sewer tie-ins, CH01 - Revision of Accessible Route and Electrical Correction notice from Sac County Inspectors.Sacramento County · 2025$100,000
CH01 - Revision of Accessible Route and Electrical Correction notice from Sac County Inspectors.Sacramento County · 2024
The scope of project is to renovate and modify the existing Mather Fire Station. It includes the build-out of (4) dorms, (2) shower rooms, (1) restroom, (1) janitor room and the installation of a new mechanical system. Existing electrical, plumbing and fire alarm systems will be modified to accommodate the new floor layout. For accessibility upgrades, provide (2) accessible parking spaces and accessible path from parking lot to the entrance of building.Sacramento County · 2021$500,000
Revision of Accessible Route and Electrical Correction notice from Sac County InspectorsSacramento County · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you STAPLES CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to STAPLES CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Sacramento · 2020
Secured facility need to contact applicant- HVAC change out of 2 existing split systems. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. mch 2 e and mch 1 e on file:City of Sacramento · 2016$28,000
Permitted projects on public record. Addresses are omitted for privacy.