pipe burst 4" sewer line approximately 150ft, install clean outs. REV01- 1 bathroom drain replacement in slab including toilet, bathroom, lab sink, laundry drain line, kitchen drain line and a sewer reroute additional 40ft of sewer line.Sacramento County · 2026$12,000
Clean out replacement 4” bullhorn style clean outs REV01 Clean out replacement 4" bullhorn style clean outs AND approximately 60ft pipe burst 4"
New Value $4,500.00Sacramento County · 2026$1,500
2 bathroom drain replacement in crawl space 25ft hand dig for sewer line and 60ft pipe burst 4", install clean outsSacramento County · 2026$8,500
Install 4" bullhorn Style Clean outs for sewer line, at the home. REV01 Install 4" bullhorn style clean outs for sewer line and replace approximately 20ft hand dig with ABS and 80ft or trenchless from pipe burst 4" also replace sewer line under the home.
added value $5,500Sacramento County · 2026$6,500
Clean out replacement 3"Sacramento County · 2026$1,000
Clean out replacement in driveway 3"Sacramento County · 2026$1,500
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Partial water re pipe for 2 bathroomsSacramento County · 2026
$2,500
Clean out install 4” REV01 Revise Scope of work to:
30ft pipe burst and install clean outs 4"
New total value- $5,500Sacramento County · 2026$1,000
Install a two way bullhorn style clean out and replace approximately 5ft of sewer line REV01 Hand dig approximately 60ft of sewer line and replace and install clean outs 4". Also rerouting kitchen and laundry drain line into sewer line
Job Value $7,500Sacramento County · 2026$1,500
replace approximately 35ft of water main 1" from meter to house shut off install 1" BALL VALVE, PRESSURE REGULATOR, HOSE BIBB REV01 replace approximately 35ft of water main 1" from meter to house shut off install 1" BALL VALVE, PRESSURE REGULATOR, HOSE BIBB and 25ft pipe burst of sewer line 4", install new clean outs.
New total value $6,500Sacramento County · 2026$3,500
Clean out replacement 4” from house to main. 2 bathroom repipe under crawlspace. REV01 clean out replacement 4" install, 3 bathroom water line replacement from meter to house with brand new Ball valve pressure regulator, Gose Bibb, 40 gallon water heater swap like for like.
New Job Value $10,000Sacramento County · 2026$5,000
repair approximately 25ft of sewer line 4" pipe (pipe burst)Sacramento County · 2026$1,000
Permitted projects on public record. Addresses are omitted for privacy.