CH-02 - REMOVED MAIN BREAKER FROM MAIN SWITCH GEAR TO MAKE ROOM FOR CONDUCTORS TO NEW MAIN SERVICE DISCONNECTSacramento County · 2024
Installation of a 103.68 kW solar PV system. Consisting of (2) 3-string inverters, roof mounted arrays, and corresponding electrical metering and safety equipment., CH-01 - Changes per Fire Department, CH-02 - H: 1. REMOVED MAIN BREAKER FROM MAIN SWITCH GEAR TO MAKE ROOM FOR CONDUCTORS TO NEW MAIN SERVICE DISCONNECTSacramento County · 2024$242,611
CH-01 - Changes per Fire DepartmentSacramento County · 2023
Installation of a 101.85kW solar PV system. Consisting of (2) 3-string inverters, (210) PV modules ,roof mounted arrays, and corresponding electrical metering and safety equipment.Sacramento County · 2023
EPC - 293.91kw Solar PV System, and 0gal Solar WH System (water heater installed null).
SEE REVISION COM-2413408 - REVISED PLANS TO REMOVE THE MAIN BREAKER FROM THE AGGREGATE PANEL TO CHOW IT AS A MLO.City of Sacramento · 2023$681,523