Proposed is a tenant improvement for the relocation of The UPS Store from 3609 Bradshaw Road, Suite H to 3643 Bradshaw Road, Suite G. The new tenant space is in the same shopping center located south of the existing tenant space. The proposed scope of work includes architectural for fixtures and finishes and includes electrical work. REV01 This is an approved project, but we were asked by Electrical Inspector Jeffrey Gee to submit a revised details sheet (Sheet A9). Specifically, the change was made to Detail #06 to show the Cord Reel Support.Sacramento County · 2026$42,000
Non structural interior renovation of an 1295 SF existing space with minor interior demolition to flooring, wall base, and modular wall. The project will consist of interior cabinetry updates/additions, appearance facelift to existing space, and associated electrical work as reflected in plans.Sacramento County · 2026$50,875
THE SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO: THE
RECONSTRUCTION OF AN APARTMENT DAMAGED IN A
RECENT FIRE WITH FIRE, SMOKE, AND, WATER DAMAGE.
DAMAGED MATERIALS AND FIXTURES WILL BE REPLACED "LIKE
FOR LIKE" INCLUDING NEW DRYWALL, NEW FLOORING, NEW
INTERIOR DOORS, NEW TUB AND FIBERGLASS SURROUND, NEW
PLUMBING FIXTURES, NEW CASEWORK AND COUNTERS IN
KITCHEN.
PLUMBING PIPING, ELECTRICAL WIRING AND WINDOWS REMAIN.
SUBJECT TO FIELD APPROVAL, CH-01 - Adding electrical locations to plansSacramento County · 2024$67,000
Tenant Improvement for UPS Store in Loehmann's Plaza. New casework and finishes typical of UPS Store, new accessible restroom, new lighting and power. Mechanical systems remain.Sacramento County · 2021$93,294
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Ad a UPS Store inside an existing business.
THE PROPOSED PROJECT INCLUDES ALL THE WORK REQUIRED TO
PERFORM THE WORK AS DESCRIBED IN THESE DRAWINGS.
TENANT IMPROVEMENT TO BUILD OUT A TYPICAL UPS STORE
INCLUDING NEW CASEWORK, AMD FLOORING NO MECHANICAL
WORK IS INCLUDED AND NO NEW ELECTRICAL WORK IS INCLUDED
OTHER THAN CONNECTING DEDICATED EQUIPMENT TO THE
EXISTING ELECTRICAL SERVICE. EXISTING LIGHTING REMAINS
AND THERE ARE NO PROPOSED CHANGES TO ANY LIGHTINGSacramento County · 2021
$17,800
Demo only existing interior down to the studs.
Demo/removal only, interior only, no cutting into or below slab, and no load-bearing elements effected. No grading, no construction or repair work.Sacramento County · 2021$18,500
Tenant improvement for a new UPS Store location at 5044 Madison Avenue, Suite D. The scope of work for this project includes the installation of new fixtures and finishes. This project also includes electrical scope of work.
New UPS Store #8265 - Tenant ImprovementSacramento County · 2026$44,000
EPC - Install new front door and remodel interior to new The UPS Store specifications including new flooring, cabinetry and paint.City of Sacramento · 2025$50,000
The UPS Store: Nonstructural interior tenant build-out for a new UPS Store (SUITE#212). Work to include construction of conventional partition walls, installation of new flooring and ceiling grid throughout, painting, fixture additions and application of branded decals and finishes. Work will also include the construction of a new ADA-compliant bathroom with all necessary plumbing, fixtures, ventilation, and finishes. Electrical, HVAC, and lighting systems will be modified or installed as required to meet code and tenant needs.Sacramento County · 2025$80,000
CH-01 - Adding electrical locations to plansSacramento County · 2024
SAFETY INSPECTION: Fire Damage Unit 133: Have electrical inspection to get power turned back on so when the permit to repair the unit is issued we will be ready to start work.Sacramento County · 2024$10
EPC - TI for new The UPS Store including electrical, sprinklers, cabinetry and flooringCity of Sacramento · 2024$74,000
Permitted projects on public record. Addresses are omitted for privacy.