108, 131, or 132 inspection required prior to covering any work; Tear off old roof relay new roof.Sacramento County · 2025$18,000
MAIN CASE FOR CBNC2021-00185 THROUGH CBNC2021-00192
Install new metal storage building in existing parking lot.Sacramento County · 2025$15,000
CH-01, Homeowner has an existing generator on property. We have added it to the one-line drawing for permit final purposes.Sacramento County · 2023
Installing a roof mounted PV solar system, CH-01, Homeowner has an existing generator on property. We have added it to the one-line drawing for permit final purposes.Sacramento County · 2023$37,900
CH-01 ADDED SOLAR PANEL AT NO COSTSacramento County · 2022
Install (N) 11kW 25 panel Solar system, CH-01 ***change description**Sacramento County · 2022$37,530
Change to MISR2022-07834: Total Array changed to 25 panels. Breaker changed as well.Sacramento County · 2022$37,530
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Install (N) 12.6kW 34 panel solar systemSacramento County · 2022$51,358
12x63.5 single wide mobile home. Will need new septic installed as well., CH-01=Original electrical plans have been downsized due to availability of electrical material originally design by electrical engineer. The one line diagram has been changed to reflect new built electrical to date ready for inspection.Sacramento County · 2022$20,442
6.6kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2024$9,000
REV TO RES-2218280 REVISIONS HIGHLIGHTED ON PV-5 ARE FOR MAIN BREAKER SIZE, FUSE SIZE IN DISCONNECT AND SOLAR BREAKER SIZE.City of Sacramento · 2022$39,851
Install (N) 12.6kW 34 panel solar systemSacramento County · 2022$51,358
Permitted projects on public record. Addresses are omitted for privacy.