What the public permit record shows, not self-reported reviews.
Is RDB CONSTRUCTION CONSULTING a real contractor?
RDB CONSTRUCTION CONSULTING appears in public building-permit records with 8 permits filed through 2025 in and around Sacramento County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is RDB CONSTRUCTION CONSULTING's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to RDB CONSTRUCTION CONSULTING by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is RDB CONSTRUCTION CONSULTING licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. RDB CONSTRUCTION CONSULTING has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is RDB CONSTRUCTION CONSULTING's work?
The most recent permit on record for RDB CONSTRUCTION CONSULTING is dated 2025-08-04, with 8 permits on file in total.
The Barbershop Tenant in space 51 "B" power, is currently tied on to the Medicare Pharmacy Panel/meter space 50-A.
The Barbershop panel, feeder and main 200 amp breaker are existing.There is a meter socket in the MSB that originally fed the Barbershop sub panel. We need a meter Tag at the main switchboard and new meter set for the barbershop 51- B, to disconnect the existing feeder circuit from the Pharmacy Sub panel and to energize the Barbershop from their own meter.Sacramento County · 2025$1,250
Medicare Pharmacy has been occupying space 50 A for approximately 5 years. They are currently tied on to a meter on another Tenants space. We are separating them from that Electrical meter and putting them on their own Meter dedicated for space 50-A.
The scope of work require's removing a circuit breaker and 60 amp wire feeding the existing 50-A panel from another Tenant Panel.Sacramento County · 2025$1,250
Electrical Meter Tags - Office space suite 50A was vacated during the Pandemic. The electric meters were turned off and 1 was removed by SMUD. We need meter Tagged by an electrical inspector so SMUD can re-energize it. There will be no work done in the spaces at this time. The power is needed so lighting can be turned on to show the space to prospective Tenants. My electrician will meet the inspector on site the day of inspection.Sacramento County · 2025$500
Electrical Meter Tags - Office space suite 60 was vacated during the Pandemic. The electric meters were turned off and 1 was removed by SMUD. We need meter Tagged by an electrical inspector so SMUD can re-energize both. There will be no work done in the spaces at this time. The power is needed so lighting can be turned on to show the space to prospective Tenants. My electrician will meet the inspector on site the day of inspection.Sacramento County · 2025
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you RDB CONSTRUCTION CONSULTING?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to RDB CONSTRUCTION CONSULTING's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$500
Storm damage repair. Re-insulate and re-drywall and paintSacramento County · 2023$2,500
SHARED (2) EPC - Installation of 9 new security lighting in existing truck and equipment parking lot. Shared plans reviewed under COM-2516360City of Sacramento · 2025$216,000
E-Permit: existing panel 125 Amps - Underground service, installation of 100 Amps replacement subpanel.City of Sacramento · 2022$1,800
EPC - Remodel to include: construction of new ceiling height partitions to create a new office on the second floor of the building. Work includes new electrical and lighting in the remodeled area. Existing mechanical. No plumbing under this permit. New finishes throughout.City of Sacramento · 2021$36,000
Permitted projects on public record. Addresses are omitted for privacy.