Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6'
beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical
panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the
water heaters cold & hot water to the gas supply lineSacramento County · 2025$500
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6'
beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical
panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the
water heaters cold & hot water to the gas supply lineSacramento County · 2025$500
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6'
beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical
panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the
water heaters cold & hot water to the gas supply line. (NTS, Detail 7)Sacramento County · 2025$500
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6'
between rods. Rods shall be bonded together and to the panel, Bond Waterline and gas to electrical
panel and attach ground wire to metal water pipe as close to the house as possible. Finally Bond the
water heaters cold & hot water to the gas supply line. (NTS, Detail 7)Sacramento County · 2025$500
Project Name: 4557; Ph3 Arden Service Area Pipe & Meter Installation:
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6' beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the water heaters cold & hot water to the gas supply line. (NTS, Detail 7)
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2025
$500
Project Name: 4557; Ph3 Arden Service Area Pipe & Meter Installation:
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6' beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the water heaters cold & hot water to the gas supply line. (NTS, Detail 7)Sacramento County · 2024$500
Project Name: 4557; Ph3 Arden Service Area Pipe & Meter Installation:
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6' beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the water heaters cold & hot water to the gas supply line. (NTS, Detail 7)Sacramento County · 2024$500
Project Name: 4557; Ph3 Arden Service Area Pipe & Meter Installation:
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6' beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the water heaters cold & hot water to the gas supply line. (NTS, Detail 7)Sacramento County · 2024$500
Project Name: 4557; Ph3 Arden Service Area Pipe & Meter Installation:
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6' beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the water heaters cold & hot water to the gas supply line. (NTS, Detail 7)Sacramento County · 2024$500
Project Name: 4557; Ph3 Arden Service Area Pipe & Meter Installation:
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6' beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the water heaters cold & hot water to the gas supply line. (NTS, Detail 7)Sacramento County · 2024$500
Project Name: 4557; Ph3 Arden Service Area Pipe & Meter Installation:
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6' beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the water heaters cold & hot water to the gas supply line. (NTS, Detail 7)Sacramento County · 2024$500
Project Name: 4557; Ph3 Arden Service Area Pipe & Meter Installation:
Install two (2) ground rods (5/8"x10') close to the existing electrical panel with a minimum of 6' beteween rods. Rods shall be bonded together and to the panle, Bond Waterline and gas to electrical panel and attache ground wire to metal water pipe as close to the house as possible. Finally Bond the water heaters cold & hot water to the gas supply line. (NTS, Detail 7)Sacramento County · 2024$500