Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Main panel update from 100A to 200A. Same location.Sacramento County · 2025$5,000
Installation of level 2 EV charger (60A circuit breaker) REV04 Install level 2 EV charger at single family residenceSacramento County · 2025$6,261
Installation of level 2 EV charger (60A circuit breaker) with DCC-12 load management device at 8037 Mountain Ave Orangevale , CA 95662 REV03 Installation of level 2 EV charger for single family residentialSacramento County · 2025$1,654
Installation of 36-panels, 14.4 kW (DC) roof mounted solar PV + 20 kWh battery energy storage system (BESS).
new 200A backup load sub panel.Sacramento County · 2025$60,000
Installation of Level 2 EV charger (60A Circuit breaker).Sacramento County · 2025$1,718
Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Scope of Work: MPU - 200A main supply, 100A service meter and Panel upgrade for main house, and adding dedicated circuit for Refrigerator, Microwave, Garage circuit.
Additional note: Remaining 100A service will be used for future ADU.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Sacramento County · 2025
$6,500
Installation of Level-2 EV charger (60A Circuit) and MPU - 200A Main service panel upgradeSacramento County · 2024$4,500
EPC - 32kw Solar PV System, and 0gal Solar WH System (water heater installed null).City of Sacramento · 2025$76,000
Install level 2 EV charger. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION.City of Sacramento · 2025$902
1. Installation of level 2 EV Charger (50A circuit breaker)
2. Generator 50A circuit breakerSacramento County · 2024$3,000
Installation of level 2 EV charger outlet NEMA 14-50 (50A circuit breaker)Sacramento County · 2024$1,200
INSTALLTION OF LEVL- EV CHARGER 50A CIRCUIT BREAKER FOR RESDITIA; BUILDING. AND ONE NEW 125 A SUB PANEL TO BE INSTALLED. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.City of Sacramento · 2024$3,000