What the public permit record shows, not self-reported reviews.
Is PETER REED ROOFING a real contractor?
PETER REED ROOFING appears in public building-permit records with 13 permits filed through 2025 in and around Sacramento County, CA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is PETER REED ROOFING's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to PETER REED ROOFING by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is PETER REED ROOFING licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. PETER REED ROOFING has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is PETER REED ROOFING's work?
The most recent permit on record for PETER REED ROOFING is dated 2025-12-19, with 13 permits on file in total.
IN PROGRESS INSP REQUIRED; Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tear off old roof install new roof composition shinglesSacramento County · 2024$21,000
IN PROGRESS INSP REQUIRED; Tear off comp install compSacramento County · 2024$17,500
IN PROGRESS INSP REQUIRED; tear off reroofSacramento County · 2024$13,000
IN PROGRESS INSP REQUIRED; Remove existing roof covering and install new cool roof comp on 3425 Farid Court Only, HALF-PLEXSacramento County · 2024$9,000
IN PROGRESS INSP REQUIRED; complete tear off and replace with new dimensional comp.Sacramento County · 2023$22,500
IN PROGRESS INSP REQUIRED; REMOVE/REPLACE COMPOSITION ROOFING AT HOUSE-APPROX. 18 SQ-COOL ROOFSacramento County · 2022$6,210
IN PROGRESS INSP REQUIRED; Tear off comp shingle roof install comp shingle roofSacramento County · 2022
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you PETER REED ROOFING?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to PETER REED ROOFING's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$13,000
IN PROGRESS INSP REQUIRED; Tear off composition shingles install composition shingles 26sqSacramento County · 2021$12,500
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 24 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater.City of Sacramento · 2025$17,000
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 24 squares of 30yr Laminated Dimensional Composition. CRRC: 0676-0152. In-progress inspection required if 10 sq or greater. CF-6R-ENV-01 required at final inspection. CF-1R-ALT on file. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314City of Sacramento · 2025$15,000
E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater.City of Sacramento · 2022$12,000
E-Permit: Tear Off - Yes, Resheet - Yes, 1 layer(s), 32 squares of 40yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater.City of Sacramento · 2020$15,000
Permitted projects on public record. Addresses are omitted for privacy.